毕业论文

打赏
当前位置: 毕业论文 > 外文文献翻译 >

模糊TOPSIS方法对初级破碎机英文文献和中文翻译(6)

时间:2022-04-14 20:41来源:毕业论文
[12] ALAVI I, AKBARI A, ALINEJAD-ROKNY H。 Plant type selection for reclamation of Sarcheshmeh Copper Mine by fuzzy-TOPSIS method [J]。 Advanced Engineering Technology and Application, 2012, 1(1): 8

[12]  ALAVI I, AKBARI A, ALINEJAD-ROKNY H。 Plant type selection for  reclamation  of  Sarcheshmeh  Copper  Mine  by  fuzzy-TOPSIS method  [J]。  Advanced  Engineering  Technology  and  Application, 2012, 1(1): 8−13。 

[13]  SAFARI  M,  KAKAEI  R,  ATAEI  M,  KARAMOOZIAN,  M。  Using fuzzy  TOPSIS  method  for  mineral  processing  plant  site  selection, Case study: Sangan Iron Ore Mine (phase 2) [J]。 Arabian Journal of  Geoscience, 2012, 5: 1011−1019。 

[14]  SHARIATI  S,  YAZDANI-CHAMZINI  A,  POURGHAFFARI BASHARI B。 Mining method selection by using an integrated model 

[J]。  International  Research  Journal  of  Applied  and  Basic  Sciences, 2013, 6(2): 199−214。 

[15]  CHEN  C  T。  Extensions  of  the  TOPSIS  for  group  decision  making under fuzzy environment [J]。 Fuzzy Sets and Systems, 2000, 114(1): 1−9。 [16]  SAGHAFIAN S, HEJAZI A R。 Multi-criteria group decision making using  a  modified  fuzzy  TOPSIS  procedure  [C]//  International Conference on Computational Intelligence for Modeling, Control and Automation  and  Conference  Intelligent  Agents,  Web  Technologies and Internet Commerce IEEE, Vienna, 2005: 215−221。

[17]  ZADEH L A。 The concept of a linguistic variable and its application to  approximate  reasoning  [J]。  Information  Sciences,  1975,  8: 199−249 (I), 301−357 (II)。 

[18]  DENG H。 Multi criteria analysis with fuzzy pair-wise comparison [J]。 International  Journal  of  Approximate  Reasoning,  1999,  21(3):  215−231。 

[19]  ERTUĞRUL  İ,  KARAKAŞOĞLU  N。  Fuzzy  TOPSIS  method  for academic  member  selection  in  engineering  faculty  [J]。  M。  Iskander (ed。), Innovations in E-learning, Instruction Technology, Assessment, and Engineering Education, 2007: 151−156。 

[20]  ROUHANI  A  K,  HOJAT  A。  Determination  of  groundwater  and geological  factors  using  geoelectrical  methods  to  design  a  suitable drainage  system  in  Gol–e–Gohar  iron  ore  Mine  [C]//  Iran, International  Mine  Water  Association  Symposium,  England,  2004: 219−224。 

[21]  BITARAFAN M R, ATAEI M。 Mining method selection by multiple criteria  decision  making  tools  [J]。  The  Journal  of  the  South  African Institute of Mining and Metallurgy, 2004, 104(9): 493−498。 

[22]  NAMIN  F  S,  SHAHRIAR  K,  KARIMI  NASAB  S。  Mining  method selection  in  third  anomaly  of  Gol-E-Gohar  iron  ore  deposit  [C]// International  Mining  Congress  and  Exhibition  of  Turkey-IMCET Turkey, 2003: 29−34。 

[23]  UTLEY  R  W。  Selection  and  sizing  of  primary  crusher。  Mineral Processing Plant Design, Practice, and Control [M]。 Published by the SME, 2002。 

[24]  KWON J, CHO H, MUN M, KIM K。 Modeling of coal breakage in a double-roll  crusher  considering  the  reagglomeration  phenomena  [J]。 Powder Technology, 2012, 232: 113−123。 

摘要:选择破碎机需要大量的关于矿山规划的设计。选择合适的初级来自所有可用的主破碎机的破碎机是多标准决策(MCDM)问题。现在的工作探索 模糊TOPSIS方法对初级破碎机英文文献和中文翻译(6):http://www.youerw.com/fanyi/lunwen_92562.html

------分隔线----------------------------
推荐内容