摘要:工程项目中的进度控制与质量控制、投资控制一样,是工程项目中的三大重点控制目标之一,在工程项目的三大目标控制关系中,质量控制是根本,投资控制是关键,而进度控制是中心。随着现代施工对施工工艺的要求越来越高,对进度的控制也愈发显得格外重要。我们一方面可以通过平行施工或者压缩关键工作等方法来加快工程进度。另一方面可以加强在施工过程中的督察力度,及时反馈,如若拖延,则立即进行督促与整改。同时可采用更加高效的施工方法,施工机械,进一步优化施工时间,以保证工程的顺利竣工。81770
毕业论文关键词:工程进度控制;施工工艺;平行施工
The progress of management in engineering construction projects
Abstract:Project engineering and quality control, progress control and investment control is one of the most important control in project construction, the construction control in the relationship of the three objectives, quality is fundamental, investment is the key, and progress is the center。 With modern construction more and more high to the requirement of construction technology, the progress of control also appears especially important。On one hand we can work through parallel construction or compressed key methods to speed up the progress。On the other hand can strengthen supervision in the construction process, timely feedback, without delay, the urge to immediately corrected。At the same time, can use more efficient construction method, construction machinery, further optimize the construction time, to ensure the project completed smoothly。
KeyWords:Project schedule control;The construction technology;Parallel construction
目录
1。绪论 4
1。1 选题背景 4
1。2 研究目的与意义 5
1。3 工程项目中三大控制的矛盾与统一性 5
1。3。1 矛盾性 5
1。3。2 统一性 6
1。4 研究方法 6
1。5。1 国内文献研究综述 7
1。5。2 国外最新的工程进度控制方法 8
2。程项目进度管理中涉及的理论和特性 12
2。1 工程项目进度控制的相关理论 12
2。1。1 工程项目管理中的相关概念 12
2。1。2 工程项目管理中的常见类型 12
2。2 进度控制技术—网络计划技术 13
2。2。1 网络计划技术的特点 13
2。2。2 单代号网络图 13
2。2。3 双代号网络图 14
2。2。4 网络进度计划的调整 14
3。工程项目进度管理的主要内容与措施 16
3。1 工程项目中设计的进度管理内容 16
3。1。1 工程进度控制的含义与目的 16
3。1。2 影响工程进度的因素 16
3。1。3 工程项目进度计划的调整 17
3。1。4 工程进度的拖延 工程建设项目中的进度管理:http://www.youerw.com/guanli/lunwen_95684.html