摘要:本设计主要针对220kV的牵引变电所进行一、二次部分设计和研究,主要的工作是对牵引变电所一、二次主接线设计和电气设备选型。其中主接线设计主要包括主接线方案设计和选择,必须符合电气主接线的基本要求和基本设计原则。电气设备选型包括主变压器的选择,短路电流的计算,绝缘设备的检验主要是关于电气设备的动稳定、热稳定性、开关设备的选型和校验,以及对室内外母线,各个支持绝缘子和穿墙套管,电压、电流互感的选型和校验,避雷器的选择,防雷接地。最后附上主接线图,基础设计图和二次设计图。20819
关键词:主接线 短路电流 设备选型 防雷接地
Abstract:
This design is mainly aimed at the traction substation of 220kV bilateral power supply one or two part design and research, the main job of traction substation is a main connection design and electrical equipment selection. Among them main connection design includes the Lord wiring scheme design and choice, must comply with the main electrical wiring basic requirements and basic design principles. Electrical equipment selection includes the choice of main transformer, the calculation of short-circuit current, insulation equipment inspection is mainly about electrical equipment dynamic stability, heat stability, switch equipment selection and calibration, and for indoor and outdoor bus, each support insulator and wear wall bushing, voltage, current mutual-inductance of the selection and calibration, choice and calibration arresters. arresters lightning-proof grounding.finally is the the main wiring diagram, foundation design drawing and the two design.
Keywords: Lord wiring short-circuit current equipment selection lightning-proof grounding
目录
一 绪论 5
1.1 课题研究背景 5
1.2 电气化铁路国内外的现状 5
1.3 发展趋势 6
1.4 工作要求 6
二 总体方案设计 3
2.1 牵引变电所概述 7
2.2 电气主接线基本要求 7
2.3 电气主接线基本形式 8
2.3.1 单母线接线 8
2.3.2 单母线分段接线 9
2.3.3 单母线带旁路母线接线 10
2.3.4 单母线分段带旁路母线接线 10
2.3.5 双母线接线 11
2.3.6 双母线分段接线 12
2.4 主接线方式选择和设计 12
2.4.1 主接线方式选择 12
2.4.2 AT牵引变电所主接线设计 13
2.5 总平面与生产房屋配置 14
三 变压器选择 15
3.1主变压器的选择原则 15
3.2变压器容量计算参数 15
3.3 变压器容量计算 17
3.3.1 供电臂1、2平均电流的计算 17
3.3.2 供电臂1、2的有效电流 19
3.3.3 变压器容量的确定 19
3.4 牵引变压器类型的选择 20
3.4.1 相数与结线选择 20
3.4.2 类型的选择 20
四 短路电流计算 23
4.1 系统的简化等值电路图 23
4.2 线路阻抗计算 25
4.3 220KV侧短路电流计算 25
4.4 27.5KV侧短路电流计算 25
4.4.1 在9000KVA侧 26
4.4.2 在8000KVA侧 26 高铁牵引变电所设计+图纸:http://www.youerw.com/jixie/lunwen_12741.html