摘要: 本次设计的内容是湖南省长沙市某商业综合楼暖通空调设计及经济分析,该商业综合楼共28层,在本设计中设计的楼层为9~28层,是商业用途的四星级的酒店,总建筑面积约为17150.1平方米,层高3.3米。通过专业负荷计算软件,算出夏季冷负荷300084.53W,冬季热负荷192570.36W,新风负荷106981.65W。空调系统方案选择风机盘管加独立新风系统。69481
毕业论文关键词: 空调设计;经济分析;风机盘管;独立新风系统
A commercial complex building of Changsha HAVC design and economic analysis
Abstract: The content of this design is a commercial building in Changsha city in Hunan province HAVC design and economic analysis, a total of 28 the commercial complex, in this design in the design of floors for 9 ~ 28 layers, is the commercial application of four-star hotel, total air conditioning area is 17150.1square metre about, the height is 3.3 meters. Through the professional load calculation software, the summer cooling load 300084.53W, the winter heat load 192570.36W and the fresh air load 106981.65W were calculated. Selection of air conditioning system, fan coil unit and independent fresh air system.
Keywords: Air conditioning design; Economic analysis; Fan coil; DOAS
目录
摘要 i
Abstract i
目录 ii
1 绪论 1
1.1 毕业设计简要介绍 1
1.1.1设计对象 1
1.1.2设计过程简要说明 1
1.2 我国空调系统使用现状及发展 1
2 工程概况和设计依据 3
2.1 工况概述 3
2.2 设计依据 3 2.2.1气象参数 3 2.2.2围护结构 3 2.2.3室外设计参数 4
3 负荷计算设计 5
3.1 夏季冷负荷计算依据 5
3.2 冬季热负荷计算依据 9
3.3 空调新风负荷计算 10
3.4 湿负荷计算的计算公式 11
3.5 负荷计算软件操作过程及负荷汇总 12 3.3.1操作过程 12 3.3.2负荷汇总 14
4 空调方案的确定 18
4.1 空调冷热源选择 18 4.1.1空调冷热源形式及其优缺点 18 4.1.2空调冷热源的确定