摘 要:本文设计的是一个降压的变电站,此变电站分为三个电压等级:高压侧 110KV、中 压侧 35KV、低压侧 6KV,其中低压侧主要为 4 台钢包精炼炉(LF)供电。本文首先根据系 统的参数,计算出短路电流;其次确定变电站高压侧、中压侧、低压侧主接线方式;最后 根据负荷的计算以及供电的范围确定变压器,断路器,隔离开关,电流互感器,电压互感 器,母线等电气设备的型号,并给出了完整的设计方案。74414
毕业论文关键词:变电站,负荷,电气元件
Abstract: This design is a step-down substation, the substation pided into three voltage levels: high voltage side of 110kV and medium voltage 35kV side, low-pressure side of 6kV, which low voltage side mainly 4 sets of ladle furnace (LF) power supply。 Firstly according to the
parameters of the system calculated short circuit flow; secondly, determined the high voltage
side of the transformer substation, medium voltage side, low voltage side of the main wiring way。 Finally according to the load calculation and the range of service to determine the transformer, circuit breaker, isolating switch, current transformer, voltage transformer, bus, etc。 electrical equipment models, and gives a whole design scheme。
Key words: substation, load, electrical components
目 录
1 绪论 3
1。1 设计目的 3
2 杭钢变电所总体结构设计 4
2。1 电气主接线的设计原则 4
2。2 电气主接线方式设计的基本要求 5
2。3 杭钢供电负荷分析 6
2。4 一次系统的设计 7
2。5 短路电流的计算 7
3 变电站一次设备的设计 12
3。1 电气设备选择的原则 12
3。2 主变压器的选择 12
3。3 110kV 高压配电装置的选型 14
3。4 35kV 高压配电装置的选型 16
3。5 6kV 高压配电装置的选型 18
结 论 21
参 考 文 献 22
致 谢 23
1 绪论
本次设计的课题是来自于杭钢 LF 炉负荷的优化工程。众所周知变电站它是在输配电 系统中起到一个重要的环节,它不仅能够对电能的汇集而且还要对电能的合理分配起着重 要的作用,所以它在电网能否安全和经济运行中起到着举足轻重的地位。杭钢目前建造着 两座枢纽变电站,它们一个为 110kV 总降变,另一个为 220kV 钢铁变,这两个变电站下设 有个 8 个 35kV 的变电站和一部分 6kV 的变电站。但是由于最近这几年杭钢不断发展壮大, 新加的设备不断的投入运营中,以至于用电负荷的不断增大,以前建造的两个枢纽变电站 要想满足系统供电的需要已经捉襟见肘,以 110kV 总降变最为突出,并且总降变的两条 110kV 进线,三台容量大概为 50000kVA 的主变压器它们分别承担着转炉厂、焦化厂、棒材 厂以及一些 35kV 变电所的负荷,其中里面一些机房与炼铁厂的高炉相关,这些机房能否 正常的运转将会直接的影响到高炉能否正常的运行。万一总降变发生了事故,那么将会给 杭钢造成非常大的影响。而这些负荷中,转炉厂的四台钢包精炼炉(LF)它们属于冲击性 的负荷,虽然钢包精炼炉的额定功率为 7000kW,但是在钢包精炼炉的冶炼过程中,最大的 负荷可以超过额定功率许多,将会达到 12000kW,不仅如此钢包精炼炉在运行工作的过程 中也会产生大量的谐波,严重污染电网,这样不仅影响了供电的质量,而且还会在总降变 的供电中存在着一个非常大的安全隐患。一旦总降变的主变压器由于某种故障需要停机检 修的时候,那么整体的负荷平衡将会非常的困难,有时候不得不进行限负荷。 杭钢变电所总体结构设计一次设备的设计:http://www.youerw.com/zidonghua/lunwen_85007.html