摘要:本课题为圣博莱阀门制造公司厂区建设前的评价,主要包括:通过调查、监测等方法了解当地环境状况(空气,地下水,地表水等),社会环境状况。根据建设项目施工要求对施工期空气环境质量,水环境质量,声环境质量等进行科学的评价。利用查阅资料法、类比分析法等方法对厂区施工期间造成的影响和它建成之后将对当地所产生的影响作出预测与评价,最后提出结论与建议,包括建设项目拟采取的防治措施。36914
毕业论文关键词:环境影响评价;影响预测
Environmental impact assessment of Shengbolai valve manufacturing
Abstract: The topic for the evaluation Shengbolai Valve Manufacturing Company plant before construction, including:understanding of the local environment (air,groundwater.surface water,etc.),social environment through surveys,monitoring and other methods.according to construction project requires the construction of air quality of the environment,water environment quality,quality of acoustic environment for scientific evaluation. Utilization data multiplexing,analogy analysis and other methods result in the construction of the plant during and after it was built to predict the impact will be locally produced.Finally, conclusions adn recommendations,including the prevention and control measures to be taken in the construction project.
Keywords: environmental impact assessment,impact prediction.
目 录
1 工程内容及规模 1
1.1 项目背景 1
1.2 项目概况 1
1.3 建设性质、产品及生产规模 2
1.4 项目组成 2
1.5 总图主要技术经济指标 2
1.6 生产制度及人员配备 2
1.7 主要生产设备 3
1.8 主要原辅材料 4
1.9 主要公用工程 4
1.10 本项目基地周边环境现状 5
1.11 节能措施 5
1.12 其他 5
2周边环境概况与环境质量状况 6
2.1 自然环境简况 6
2.1.1 地形、地貌、地质 6
2.1.2 气候、气象、水文 6
2.1.3 植被、生物多样性 6
2.2 社会环境简况(社会经济结构、教育、文化、文物保护等) 7
2.3 环境质量状况 7
2.3.1 环境空气质量 7
2.3.2 地表水质量 8
2.3.3 声环境质量 8
2.3.4 主要环境问题 8
2.4 环境质量评价标准 8
2.4.1 污染物排放标准 8
2.4.2 总量控制标准 9
3 建设项目工程分析 10
3.1工艺流程简述 10
3.2 主要污染工序 10
3.2.1施工期主要污染工序 10
3.2.2营运期主要污染工序 10
4 环境影响分析 12
4.1施工期环境影响简要分析 12
4.1.1 施工期环境空气影响分析 12
4.2 污水排放影响分析 13
4.2.1 施工期污水排放影响分析 13
4.2.2 施工期污水控制措施 13
4.3 施工期声环境影响分析 13
4.3.1 施工期声环境影响特征 13
4.3.2 施工期声环境保护对策措施 14
4.4 施工期渣土处置及其管理 15
4.5 加强施工期环境管理 15
4.6 要求和建议 16
4.7 结论 16
4.8运营期环境影响分析 16 阀门制造厂区环境影响评价:http://www.youerw.com/huaxue/lunwen_35580.html