毕业论文

打赏
当前位置: 毕业论文 > 化学论文 >

大剧院建筑给排水工程设计+CAD图纸

时间:2021-07-17 16:43来源:毕业论文
某大剧院建筑给排水工程设计,设计的主要内容有:建筑给水系统、建筑排水系统、雨水排水系统,消防系统。建筑层数:地下一层,地上四层。建筑面积61805.82㎡

摘要:本次设计的主要内容为某大剧院建筑给排水工程设计,设计的主要内容有:建筑给水系统、建筑排水系统、雨水排水系统,消防系统。建筑层数:地下一层,地上四层。建筑面积61805.82㎡,其中地上建筑面积:21004.9㎡,地下建筑面积41800.92㎡。建筑高度为24m。建筑分类:多层公共建筑。从市政道路接入一根DN150引入管作为本工程生活水源,接入一根DN80引入管作为本工程中水水源,剧院内雨污水管网齐全。本工程水源由市政给水管网提供,城市管网压力不低于0.3MPa。计算得出生活最大日用水量71.5m3/d,中水最大日用水量27.3m3/d。消防系统主要包括消火栓给水系统、自动喷淋灭火系统、雨淋系统、水幕系统和大空间智能型主动灭火系统,其中室内消火栓用水量为15L/s,室外消火栓用水量为30L/s,自动喷淋灭火系统用水量为35L/s,雨淋系统用水量为125L/s,水幕系统用水量为25L/s。排水系统采用室内污水废水合流制,室外污水雨水分流制。最高日污水排放量77m3/d(按生活用水量的90%计)。生活污水经化粪池预处理后排入市政污水管网。雨水排放系统采用虹吸雨水和重力雨水系统相结合的方式。69477

关键字: 建筑给排水;雨水排水;消火栓;自动喷淋

Design of water supply and drainage for a grand theater

Abstract:The main content of this design for a grand theater building water supply and drainage engineering design,includes architectural water supystem,and fire extinguishing system.Building storey: one floor below ground, four floors above ground. Construction area 61805.82 ㎡, of which the building area is 21004.9 ㎡,and underground construction area is 41800.92 ㎡. The height of the building is 24m.Building classification: multi-storey public buildings. Access to a DN150 pipe from the municipal road as the living water sauce and switch in a DN80 inlet pipe  as a reuse water source in this project.The rainwater sewer network is completed in this theater. The water supplyment of this project is provided by the municipal water pipe network, and the pressure of city pipe network is no less than 0.3 MPa.The maximum daily water consumption anduse is 71.5 m3 / d and  27.3 m3 / drespectivly.Fire extinguishing system mainly includes the fire hydrant water supply system, automatic spray fire extinguishing system, rain system, drencher system and large space intelligent active fire extinguishing system,and the indoor fire hydrant water consumption is 15 L/s, outdoor fire hydrant water is  30 L/s, automatic water spray extinguishing system of 35 L/s, rain system water is 125 L/s, drencher system water consumption is 25 L/s.The drainage system adopts the method that combines indoor sewage wastewater with water runoff system, and the outdoor sewage water separateed system. The maximum daily sewage discharge is 77m3 / d (90% of the water used in life).The living sewage is treated by the septic tank before drained to the municipal sewage pipe network. The system adoptsa combination of siphon rain and gravity rainwater.

Keywords:water supply and drainage;rainwater drainage;fire hydrant;automatic sprinkler

目录

摘要 I

Abstract II

1  设计任务及资料 1

1.1设计任务 1

1.2建筑设计资料 1

1.3城市给排水管网资料 1

1.3.1给水水源 1

1.3.2排水条件 1

1.4设计依据 2

2  设计说明书 大剧院建筑给排水工程设计+CAD图纸:http://www.youerw.com/huaxue/lunwen_78377.html

------分隔线----------------------------
推荐内容