INTRODUCTION

1.1 GENERAL

The Kikeh Area is located 120km northwest of the island of Labuan, offshore Sabah, East Malaysia in approximately 1300m water depth. The area is within the Murphy Sabah Oil Co., Ltd. (Murphy) and Petronas Carigali Sdn Bhd (PCSB) Block K PSC, awarded to Murphy PCSB in 1999.

The Kikeh Development consists of a Floating Production Storage and Offloading vessel (FPSO), which receives production from wells drilled from a wellhead only Dry Tree Unit, located between the Kikeh Field and the Kikeh Kecil Field. The project includes both dry tree and subsea production and water injection wells. All fluids processing occurs on the FPSO. In the future K-5 Fault Block production and water injection wells will be “piggy backed” to Kikeh South.

Water injection will be used to maintain the pressure of the reservoir. Water injection equipment will be located on the FPSO and then distributed to the DTU and subsea wells. Water injection will be required from “Day 1” of production.

Gas injection is not required for reservoir management purposes. Gas will only be re-injected to enable oil production to continue, in the event gas export is interrupted. The system will be designed to enable simultaneous gas injection and export to allow for onshore demand fluctuations.

The associated gas is exported by a 12-inch pipeline from the Kikeh area to the existing onshore gas terminal in Labuan (LGAST), a distance of approximately 138km.

TL Offshore (Sapura Acergy) has been awarded the EPCIC contract for the KGP, who has subsequently commissioned J P Kenny Wood Group Sdn Bhd (JPK) to perform the detail design.

1.2 SCOPE OF THE DOCUMENT

This report addresses the PLEM and PLEM Support Frame design for the in-place conditions and establishes the following:

In-Place Loadings;

PLEM structure in-place stability;

Confirmation of primary member sizes based on in-place loading conditions;

Loading imposed on the Suction Can foundation for design by Acergy.

This report is part of the overall PLEM design which is addressed in Ref 5. Other design aspects related to the in-place condition, as listed below, are addressed in separate reports:

Impact and ROV intervention loadings (Ref. KIK-TLO-JPK-55-PS-RP-0008)

Piping stress (Ref KIK-TLO-JPK-55-PS-RP-0004)

Pipe supports (Ref. KIK-TLO-JPK-55-PS-RP-0008

Cathodic Protection (Ref KIK-TLO-JPK-55-PS-RP-0006)

1.3 ABBREVIATIONS

The following abbreviations will be used throughout this document: ASME American Society of Mechanical Engineers

AISC-ASD American Institute of Steel Construction – Allowable Stress Design API American Petroleum Institute

CG Centre of Gravity

DNV Det Norske Veritas

FEA Finite Element Analysis

FEM Finite Element Model

GIM Gas Injection Manifold

HAT Highest Astronomical Tide

ID Internal Diameter

JPK J P Kenny Wood Group Sdn Bhd

LAT

上一篇:旋转式伺服电机的柔性电子系统英文文献和中文翻译
下一篇:没有了

基卡气体管道PLEM结构的原...

超临界CO2气体冷却器英文文献和中文翻译

气压管道模型受不稳定剪...

护理干预對康复期精神分...

冯子振其人及其文学创作研究

手持式液压扳手设计+CAD图纸

心理失衡护理茬慢性乙型...

心理护理對腹腔镜胆囊切...

歌曲我们湜光荣的煤矿工...

未来什么手艺好发展呢,...

人文精神与西方法治传统【14613字】

县区级财政预算绩效管理初探【3041字】

我国非法证据排除规则的研究