    As China's economic development, materials, machinery, equipment industry relevant development, which is our long-span cable-stayed and suspension bridges built to provide a strong guarantee. Coupled with careful design and construction of the majority of bridge builders, so the level of the bridge has been awarded to the world advanced level. China's vast territory, levels of economic development, the overall level is not high on the economy, the development of roads and bridges, or to focus on large, wide surface is generally large, in the bridge, the bridge is still kind of prestressed concrete structures based. Among them, simply supported beam bridge design, simple construction, short construction period. But the bridge expansion joints are more poor driving conditions; midspan moment large pier top moment is zero, structural discontinuity reasonable; high beam only by cross-sectional moment of control, other cross-sectional material can not be fully utilized. Bracket situ continuous beam reasonable force, good driving conditions, but higher construction process requirements, need a lot of support, high construction costs; piers, abutments after all the construction in order to make the upper part of the construction, and therefore a longer duration. The perse nature of the various bridge type, so that we can be more suited to local conditions to choose which type of bridge, make a bridge to better serve people. Therefore, we should focus on grasping persification, standardization, preparation of standard figure applies economy, improve the level and quality of construction, and then grab across the river (River), large bay bridge construction, constantly sum up experience, not only embodies the human highway construction bridge level, but also to ensure high standards and quality bridge. Reform and opening up, the party's policies to enrich, change people's understanding, "To get rich, first build roads" has become a consensus to accelerate transportation infrastructure has become a people's initiative. Diversification of the national investment priorities and financing channels tilt for the development of roads and bridges has provided funding guarantee. Looking highway bridge development trends, cherish the opportunity to work creatively, to change the backward situation of China's highway construction, efforts to study and improve themselves, contribute to nation-building as a bridge.
    The main contents of this design is the Suzhou Wuzhong District Tangqiao design. Design three bridge-type program, were simply supported beam bridge, T-shaped rigid frame bridge and prestressed concrete girder bridge, recommend solutions for simply supported prestressed girder bridge.
    This bridge is 30 + 30 + 30 + 30 = 120m long. Girder using T-shaped cross section, such as the height of the beam height, the main beam of the prefabricated construction method. Piers are double-column pier, the foundation for the bored pile foundation. Rib assembly simply supported beam bridge can save a lot of templates bracket, shorten the construction period, accelerate the speed of the bridge, so widely used. Advantages fabricated T-beam bridge is to create a simple, holistic, easy fitting, is currently one of the most commonly used form of bridge structures. Bridge Deck: use 8cm thick waterproof as concrete pavement, plus 6cm of asphalt concrete wearing course, a total of 14cm thick. Main Bridge Pier Foundation adopts 12 φ = 1500 bored; thickness caps take 2.5m; in order to reduce the flow of water on the pier caps impact, the two caps transverse to the outer edges of the shape of an arc-shaped design The main bridge piers with double Shaft Piers.
    Midas program calculates the constant use of live load and internal forces of the construction phase, and then a combination of internal forces, configure prestressed bridge beams calculated after the whole experience count to meet regulatory requirements. Assembling prefabricated construction methods.
    Keyword:Simply supported T-beam; Prefabricated subassembly;
  1. 上一篇:某县行政办公楼设计+CAD图纸
  2. 下一篇:昆山市正阳大桥设计(简支梁)设计+CAD图纸
  1. 美国西雅图某高架匝道桥梁设计

  2. 芜湖恒丰大桥预应力混凝...

  3. 预应力混凝土连续梁桥小箱梁设计+CAD图纸

  4. 江苏靖江夏仕港大桥主桥连续梁设计

  5. 上海轨道交通南桥延伸段...

  6. MIDAS的7*30m简支T梁设计

  7. 城市高架全拼装桥梁设计

  8. g-C3N4光催化剂的制备和光催化性能研究

  9. NFC协议物理层的软件实现+文献综述

  10. 巴金《激流三部曲》高觉新的悲剧命运

  11. 上市公司股权结构对经营绩效的影响研究

  12. 高警觉工作人群的元情绪...

  13. 现代简约美式风格在室内家装中的运用

  14. 中国传统元素在游戏角色...

  15. 江苏省某高中学生体质现状的调查研究

  16. C++最短路径算法研究和程序设计

  17. 浅析中国古代宗法制度

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回