摘要本设计根据该冶金机械厂的相关资料和实际情况,对该厂的总降压变电所和高压供电系统进行设计。本设计首先根据工厂提供的资料对工厂的负荷用需要系数法进行了计算,根据负荷情况对变压器的容量和台数进行了选择。该厂电源由某变电所以35kV双回路架空线引出,本设计选择在该厂设立总降压变电所先将电压降为厂区供电电压6kV,再由各车间变电所降为负荷所需电压。为保证供电系统的可靠性,总降压变电所采用单母线分段式接线方式,厂区供电系统采用放射式接线方式。通过对系统的短路电流的计算,本设计对各变电所的主要电气设备、电缆和母线进行了选择和校验,对一次侧主要设备进行了继电保护整定,同时对避雷和接地装置进行了选择,画出了系统总的设备接线图。64489
毕业论文关键词 工厂供电 变电所 主接线 电气设备的选择与校验 防雷与接地
毕业设计说明书(论文)外文摘要
Title The Design of Total Substation and High Voltage Supply System for A Metallurgical Machinery Plant
Abstract
The design of Metallurgical Machinery Plant under the relevant information and circumstances, the plant's general step down substation and high voltage power supply system design. First, the design of information provided under the plant load factory conditions were calculated, according to load situation on the transformer capacity and numbers were selected. The plant is powered by a substation to 35kV double circuit overhead line extraction, the establishment of the design choices in the plant reduced the total voltage step-down substation plant first supply voltage 10kV, the load is reduced by the plant substation required voltage. To ensure the reliability of power supply system, the total step-down substation single bus segmental wiring, the factory power supply system with radial terminals. By calculating, the design of the main electrical substation equipment, cables and bus selection and validation carried out on the lightning protection and grounding devices of choice,and draw up the equipment wiring diagram of the power system.
Keywords plant power supply substation main wiring the selection and check of electrical equipment lighting protecting and grounding devices
目 次
1. 绪论 1
1.1工厂供电的意义和及要求 1
1.2 工厂的原始资料 1
1.3 设计的具体内容 2
2. 工厂的负荷计算 3
2.1需要系数法计算负荷 3
2.2总负荷计算及无功补偿 5
3. 总降压变电所及变压器的选择 7
3.1变电所所址与形式的选择 7
3.2 厂区供电电压的选择 8
3.3变压器的台数和容量的选择 9
3.4 主接线的方案选择 10
3.5 变电所二次回路电源设计 12
4 短路电流的计算 13
4.1 短路电流计算的目的 某冶金机械厂总降压变电所及高压供电系统设计+电路图:http://www.youerw.com/zidonghua/lunwen_71683.html