摘要本毕业设计是完成电机修造厂总降压变电所及高压配电系统设计,根据设计任务书的要求完成的工作。主要内容为:电机修造厂负荷计算,短路计算,无功补偿的计算,变压器型号的选择,变电所位置以及型式的选择,在一次侧以及二次侧进行的三相短路电流的计算和短路容量的确定,确定一次侧和二次侧所使用的各种电器元件的选择,线路型号的选择,接地和防雷保护,以及继保方面的整定计算,绘制电机修造厂总降压变电所的电气主接线图。上述内容全部符合电气设计相关规范的要求,完成设计任务书的要求的内容。65012
毕业论文关键字 工厂供配电设计 短路计算 设备选型 电气主接线图
毕业设计说明书(论文)外文摘要
Title The total step-down substation of a motor factory Design and high voltage power distribution system
Abstract Motor plants of the completion of this graduation design is the general voltage substation and high voltage distribution system design, according to the requirements of the design plan descriptions of the work. Main content is: motor plants load calculation, short circuit calculation, the calculation of reactive power compensation, transformer model choice, the choice of location and type of substation, in the primary side and secondary side of three-phase short-circuit current calculation and the determination of short-circuit capacity, determine the primary side and secondary side the use of various electrical components selection, line type choice, earthing and lightning protection, as well as on the surface setting calculation, drawing electrical plants general voltage substation main electrical wiring diagram. All the above contents accord with the requirement of related specification, complete the content of the design specification requirements.
Keywords Factory power supply design Short circuit calculation Equipment selection The main electrical wiring diagram
目 次
1. 绪论 1
1.1课题的主要任务和目的 1
1.2 本次设计的主要进程 1
2. 设计依据 2
2.1、工厂总平面图 2
2.2、工厂各车间的负荷情况及车间变电所的容量 2
2.3 供用电协议 4
3. 具体设计及计算说明 5
3.1电机修造厂的负荷计算及无功补偿计算 5
3.2 确定电机修造厂总降压变电所的所址和型式 6
3.3变压器容量及台数的选择 8
3.4确定电机修造厂总降压变电所的主接线方案 8
3.5短路计算,并选择一次设备 11
3.6 选择电机修造厂电源进线及高压配电方案 19
3.7 选择电源进线的二次回路方案,并整定继电保护 25
3.8 电机修造厂总降压变电所防雷保护及接地设计 32
结论.35
致谢.36
参考文献.37
附录1 35kV电力变压器继电保护原理图.38
附录2 电机修造厂总降压变电所电器主接线图. 39
附录3 电机修造厂总降压变电所平面布置图 .40
附录4 电机修造厂总降压变电所接地装置位置示意图 .41 电机修造厂总降压变电所及高压配电系统设计+图纸:http://www.youerw.com/zidonghua/lunwen_72467.html