摘 要:建设项目的预算是指项目在施工过程中的技术经济文件,按照设计文件的不同以及相关的定额,具体的指标和费用,用于预先计算和确定成本所有施工项目的成本。项目预算分为四个项目,主要分为设计估计,修订预算,施工图预算和施工预算。建筑工程的造价在我们的国家有的时候老是出现这几种情况:概算比估算多、预算比概算多、决算比预算多的“三超”现象。这种情况的出现很大程度上困扰和阻碍着工程建设项目的投资效率和管理的有效性。基于这种情况,对工程造价、项目成本的控制、管理的合理性方面加强是很有必要的。这样做不仅仅是为了控制项目成本在一定的范围之内,还在于能够有效地把人力、财力、物资有机结合和利用起来。从而控制固定资产投资效益。90691
本文对南京溧水碧桂园翡翠园12#楼预算书编制,遵循《房屋建筑与装饰工程计量规范计算规则(2013-江苏)》,套用的是《江苏省建筑与装饰工程计价定额计算规则(2014)》,采用《工程量清单项目计量规范》和《江苏省建筑与装饰工程计价定额》等规范。首先新建工程、定义轴网和构件并套取定额,由柱、墙、梁、板等顺序绘制,并最终得到整栋楼的建筑模型,最后得出工程造价。
毕业论文关键词:工程量,清单,定额,施工图算量
Abstract:Construction engineering budget refers to the project in the construction process, according to the specific content of different design documents inside and the related quota index and fee standard, used to calculate and determine the technical and economic documents in advance of all construction projects cost。 Project budget is pided into four items, mainly pided into design, modification the budget, construction budget and construction budget。 The construction cost in our country often appear over budget estimates, budget over budget, over budget accounts for the "super three" phenomenon, the phenomenon of serious trouble of the construction project investment benefit and management。 So we need to strengthen the management of project cost can be reasonably determined and effective control The purpose of the project cost is not only to control the investment of the project within the scope of the approval, but also to use human, physical, financial and control the investment efficiency of fixed assets effectively and reasonably
In this paper, the nanjing LiShui country garden jade garden 12 # building budget establishment, follow the rule for calculating the measurement of housing construction and decoration engineering (2013 -), jiangsu province, to paraphrase is the jiangsu province construction and decoration engineering valuation quota calculation rules (2014), using the "bill of quantities project metrological specification" and "jiangsu province construction and decoration engineering valuation quota" and so on。 First new construction, define the axis web and component and show the quota, by order, such as column, beam, plate, wall map, and finally get the whole building construction model, finally it is concluded that the project cost。
Keywords:engineering drawing, quota, construction drawing calculation。
目 录
1 设计选题说明 4
1。1 选题依据 4
1。2 设计项目概况 4
1。3 设计目的和要求 4
1。4 设计的难度 4
2 设计依据 5
2。1 理论与方法 5
2。2 规范和标准 南京溧水碧桂园翡翠园12#楼预算书编制+CAD图纸:http://www.youerw.com/gongcheng/lunwen_197983.html