1.摘要本工程为庆云寺扩建项目藏经楼,由庆云寺投资兴建,本项目位于龙东大道北北边,东临东川路,北面为合庆手帕厂,结构型式为现浇钢筋混凝土框架结构,地下一层,地上五层;高度为23.00米,新增地基面积为925.5平方米,总建筑面积1902.94平方米,其中地下建筑面积394.2平方米,地上建筑面积1508.74平方米,建筑使用年限为50年,建筑抗震设防烈度为7度;建筑总体规则,规则的结构不仅便于施工,而且有利于结构抗震。48110
设计的内容主要是框架结构设计,提供全套建筑施工图,要求完成以下工作和完成后具备以下能力:
1,熟练运用PKPM系列软件完成整体结构的建模工作,具备根据现行规范对模型分析结果进行分析判断和调整试算的能力; 2,熟练运用TSSD完成结构施工图,熟练掌握梁平法标注法、柱平法标注法和表格法、现浇板配筋的主流表达方法;3,能熟练掌握毕业设计所涉及到的梁、柱、板等构件的主要构造措施; 5,能基本看懂地质勘探资料,能设计一个单体的预制管桩基础,了解预制管桩基础的基本设计过程和计算内容,掌握桩基础的施工图表达方法; 6,掌握楼梯的设计和计算方法; 7,掌握结构计算书的编制方法和编制内容。可供选择增加的内容 :1,预制装配式设计;或者2,使用Revit完成工程信息化建模。
关键词:现浇钢筋混凝土框架结构、建筑设计、结构设计、平法标注、桩基础。
1 Abstract
The project for the expansion project of Qingyun Temple Tripitaka floor, built by the Qing Temple investment, the project is located in the North East long avenue north, Dongchuan Road East, North Heqing handkerchief factory, structure type of cast-in-place reinforced concrete frame structure, underground layer, fifth floor; height of 2.3 meters, the new foundation area of 925.5 square meters, with a total construction area of 1902.94 square meters, the underground construction area of 394.2 square meters, construction area of 1508.74 square meters, the useful life of 50 years of building, the seismic fortification intensity is 7 degrees; general rules of construction and structure of the rule not only to facilitate the construction, and have for the earthquake resistant of the structure.
The design of the main content is the framework of the structure design, to provide a full set of construction drawings, the following requirements to complete the work and have the following capacity:
1, skilled use of PKPM software to complete the modeling work of the whole structure, according to the current standard of have the model analysis results were analyzed and adjusted trial judgment; 2, skilled use of TSSD to complete the construction drawing, master Liang Pingfa annotation method, mainstream column flat method labeling method and form method, cast-in-place reinforced expression methods; 3, the main construction measures to master graduation design involves the beams and columns, plates and other components; 5, to understand the basic geological exploration data, to design a single precast pile foundation, understand the basic design process and calculate the content of the Guan Zhuangji foundation prefabricated construction method, the expression of master pile foundation; 6, master the design and calculation method of the stairs; 7, grasp the compiling method and compiling content structure calculation. Available options: 1, prefabricated assembly design; or 2, the use of Revit to complete the engineering information modeling.
Key words: cast in place reinforced concrete frame structure, architectural design, structural design, leveling method, pile foundation.;
目录
0 摘要 5
1 建筑设计 7
1.1 设计依据 5层南祥寺藏经阁结构设计+CAD图纸:http://www.youerw.com/gongcheng/lunwen_50451.html