By the calculated total load, to determine the form of systems, this design, I will layer, layer by layer, and 10 unified district water system; layer 3-9 rooms divided into two area water system, using fans coil plus fresh way. Combining the characteristics of the building, in the chilled water system to determine the choice I closed, vertical differentiation process, double-control, single-stage pump, variable flow system, this air conditioning system has a simple structure, the initial investment is small, difficult to produce pipeline dirt and corrosion, the advantages of smaller pump power. Design will be air-conditioned room set at the top, deal with air-cooled, use air-cooled screw air conditioning units, model LSBLGF440/A1. This design is that a good reduction of the cooling tower, chilled water pump and a series of cooling equipment to meet the requirements of the premise makes the design tends to simplify.
According to the given design parameters and calculated parameters, find the appropriate data manual for the system of hydraulic calculations, hydraulic calculations, according to already draw system sketch, determine the system's most unfavorable pipe, mark the most unfavorable pipe node , by assuming the hydraulic sub-flow method calculations on the diameter of the pipe and the piping of the hydraulic losses, hydraulic loss for pipe larger diameter pipe to adjust, come to a reasonable total water along the way loss. Based on the calculated hydraulic losses along the way, a reasonable estimate of the share of local head loss, determine the total water loss, according to a variety of equipment selection formula is calculated for selected machinery, pumps and fans to determine the appropriate model. Excel summary data compiled in tabular form.
Fan coil, water pumps and ancillary equipment such as equipment selection and determine the model calculation. According to the design conditions and the total cooling, heat load and the design have been identified, equipment form, select the air duct and the terminal equipment, cold and heat source equipment. Selection based on different levels in different functional requirements of the new wind load, one layer of fresh air unit model DBFP12, 2 to4th floor room selection DBP3 new air unit. Fan coil in this design I chose computing models, mainly FP-10XD、FP-12.5XD and FP-14XD。
目 录
1 概 况 1
1.1 工程概述 1
1.2 设计原始资料 1
1.2.1 地理位置 1
1.2.2 气象资料 1
1.3 办公建筑空调设计特点 2
2 空调负荷计算 3
2.1 冷负荷计算 3
2.2 主要计算公式 4
2.3 建筑物墙体的围护结构最小传热阻计算 5
2.4 建筑物窗体及遮阳设施 6
2.5 采暖设计中的参数 6
2.5.1 外墙计算 6
2.5.2 内墙计算 6
2.5.3 外窗计算 6
2.6 冷负荷系数法计算 7
2.7负荷计算数据汇 12
3 大厦空调方式的比较和选择 14
3.1 空的调风系统选择及方案比较 14
3.2 空调水系统的选择及特点 18
4 空调设备选型 21
4.1 空调机组选型 21
4.2 风机盘管的选择 22
4.3 新风机组的选择 23
4.4 冷水机组的选择 24
4.5 冷冻水泵的选择 24
5 气流组织计算 25
5.1 气流组织的形成 25
5.2 风口大小的选择 26
6 水力计算 26
6.1 风管布置 26
- 上一篇:县城市绿地公园系统规划设计
- 下一篇:家用防火避难舱设计
-
-
-
-
-
-
-
上市公司股权结构对经营绩效的影响研究
巴金《激流三部曲》高觉新的悲剧命运
NFC协议物理层的软件实现+文献综述
浅析中国古代宗法制度
C++最短路径算法研究和程序设计
高警觉工作人群的元情绪...
现代简约美式风格在室内家装中的运用
江苏省某高中学生体质现状的调查研究
中国传统元素在游戏角色...
g-C3N4光催化剂的制备和光催化性能研究