The building is located in Guangzhou, is a 15-story luxury hotel, the building area of 142806 square meters. A main foyer, reception, as customers, 2 to 4 for layers to restaurant in the hotel, 5 to 15 for a hotel room, each room comes with both toilet and wash basin features, sitting stool and shower. The air-conditioning design is mainly directed for the whole building.
Main methods of this design is according to the design plan, combined with the knowledge, access to data and specifications, according to actual condition choose different cold and heat source for heat and mass transfer, and the air conditioning mode, design conform to the requirements of the specification, safety, energy saving, reliable, durable, meet the building function of hvac system.Specific design content includes:
1. The air conditioning room cooling load in summer and winter heating load calculation;
2. The fan coil plus fresh air system design;
3. The wind system design;
4. The design of water system;
5. The choice of cold and heat source;
6. Refrigeration room and air conditioning equipment room arrangement;
7. Air conditioning pipeline and equipment noise reduction measures;
8. Draw all kinds of system main plane, section and system diagram.
The whole building, all adopted the new Canadian Wind fan coil air-conditioning systems. As a result of these air-conditioned rooms more, the corresponding area of smaller, separate rooms require adjustment, and the room temperature and humidity requirements do not strictly, have adopted the new Canadian Wind fan coil air-conditioning systems.
The new wind-based system, an independent supply of indoor and outdoor weather can change with the adjustment, which is the new wind to deal with indoor parameters, do not assume room load to ensure that indoor humidity and Xinfeng Liang requirements. This programme is improving the system of regulation and the flexibility of operation, and the fan-coil into the water supply can be appropriately raise the temperature, water mains condensation phenomenon can be improved.
As the building's air conditioning system using water-pressure gas tank closure expansion tank means constant pressure. Taking into account the simple design of the pipe line system, the design of water systems in a dual-tube. Rooms vary for the horizontal part of program, namely for, the backwater stem the flow of the opposite direction, each Yi Huanlu ranging from the length of the pipeline, without the return by the way, tubes shorter length, the pipeline simple vertical for the same Program, that is, that is, for, backwater stem the flow in the direction of the same, after each Yi Huanlu the same length of pipe, use of the way so that water distribution, regulation of convenient.
目录
1 概 况 5
1.1 工程概述 5
1.2 设计依据 6
2 空调负荷计算 7
2.1 空调负荷计算方法发展 8
2.1.1 稳定计算法时期 8
2.1. 2 周期热作用下的不稳定计算法时期 9
2.1.3 动态负荷计算时期 9
2.1.4空调负荷计算方法简单介绍 9
2.2 冷负荷计算原理 10
2.2.1 文护结构冷负荷 10
2.2.2 室内热源散热形成的冷负荷 12
2.3 冷负荷计算实例 13
2.4 建筑物所有楼层负荷统计 18
2.5负荷统计及曲线图 19
3 空调系统设计 20
3.1 系统形式的确定 20
- 上一篇:分布式光纤传感技术与工程应用研究
- 下一篇:五层现浇钢筋混凝土框架结构和建筑设计+CAD图纸
-
-
-
-
-
-
-
g-C3N4光催化剂的制备和光催化性能研究
NFC协议物理层的软件实现+文献综述
江苏省某高中学生体质现状的调查研究
高警觉工作人群的元情绪...
C++最短路径算法研究和程序设计
浅析中国古代宗法制度
中国传统元素在游戏角色...
上市公司股权结构对经营绩效的影响研究
巴金《激流三部曲》高觉新的悲剧命运
现代简约美式风格在室内家装中的运用