Safety check list method inspection project system, complete, can do not missing any key factor can lead to dangerous, to avoid the traditional security checks of the negligence, omission, etc, which can easily be seen in the disadvantages, thus can guarantee the quality of security checks; Can according to the existing rules and regulations, standards, procedures, etc, check, give a good indication of evaluation; Safety inspection table with the method of questions, ask answer, gives the impression of deep, can make people know how to do is right, and therefore can have the effect of safety education; Prepare a list of the safety inspection process itself is a process of system safety analysis, can make the inspection personnel to the understanding of the system is more profound, more easy to find risk factors; To examine the different objects have different checklist, inspection purpose, wide application range.
Fault type and impact analysis is the identification of dedication ideas, rarely overlook important events; Identify risks is completed by the working group together, give full play to the collective wisdom; Arranged beforehand, work carefully. Especially suitable for the system or equipment components may occur at the university of possibility or probability and so on to conduct a comprehensive and systematic qualitative and quantitative analysis, and in view of the fault condition is put forward corresponding detection methods and preventive measures, and thus has strong systematic, comprehensive and scientific.
Expert appraisal method also calls the qualitative evaluation method and comprehensive evaluation method, the bid evaluation committee according to the predetermined evaluation content, such as quotation, time limit for a project, technology scheme and quality, etc., for each item of bidding documents together with qualitative analysis, comparison, after review, select the bid documents in all the indicators are a good candidate for the winning bidder, you can also use a vote of the way to determine the candidate for the winning bidder. This approach is, in fact, qualitative method.
Through the use of these safety assessment methods for hazard identification, can the construction safety management in the process of feasible suggestion put forward all kinds of safety measures.
Key words: large span Bridges; Hazards identification; LEC method; The accident tree method; Safety construction organization design.
Keywords: large-span bridges; development; bridge major security incidents; reduced; reasonable
目 录
1绪论 1
1.1 研究目的与意义 1
1.2 国内外研究现状 1
1.3 桥梁施工安全事故的类型 2
1.4 桥梁危险源辨识 3
1.5 桥梁施工安全分析方法的选择 3
2 工程概况 3
2.1 某特长桥梁设计概况 3
2.2 施工过程 3
3 桩基施工过程中安全评价分析 4
3.1 桩基施工过程中安全危险源识别 4
3.2 安全评价方法 4
3.2.1 LEC法 4
3.2.2 事故树法 7
3.2.3 安全检查表法 13
3.3 三种安全评价方法对比分析 14
4 焊接作业施工过程中安全评价分析 16
4.1 焊接作业过程危险源辨识 16
4.2 安全评价方法进行分析 16
4.2.1 故障类型及影响分析 16
4.2.2 安全检查表法 17
4.2.3 LEC法 18
4.3 三种安全评价方法对比分析 19
5 脚手架施工过程中安全评价分析 20
5.1 危险源辨识 21
5.2 安全分析法 22
- 上一篇:大厦空调系统设计+CAD图纸+回风管水力计算
- 下一篇:市政给水泵站改造工程可行性研究报告编制
-
-
-
-
-
-
-
江苏省某高中学生体质现状的调查研究
C++最短路径算法研究和程序设计
现代简约美式风格在室内家装中的运用
NFC协议物理层的软件实现+文献综述
中国传统元素在游戏角色...
g-C3N4光催化剂的制备和光催化性能研究
高警觉工作人群的元情绪...
上市公司股权结构对经营绩效的影响研究
浅析中国古代宗法制度
巴金《激流三部曲》高觉新的悲剧命运