摘要: 此次设计一个装机容量是600MW 的热电厂,2 台 300 MW 发电机变压器组。主要对热电厂的一次系统进行设计,包括对主接线、主设备以及导线等的选择。主接线是决定整个发电厂、变电所的性质、特点和技术性能的主要因素,对主接 线的合理设计直接影响系统的安全稳定与经济可靠;保证各种电气设备额定电压 和额定电流所要满足的稳定性条件;导线分别从材料和截面积两方面着手,根据 不同需要选择不同种类的导线。最终使整个一次系统设计满足可靠性、灵活性以 及运行的经济性。 75426
毕业论文关 键 词:一次系统,主接线,主设备,导线
Abstract: The design of a capacity is 600MW thermal power plant, two 300MW generator transformer set。 To design a system of thermal power plant, including the main connection, main equipment and wire, etc。 Main wiring is to determine the nature and characteristics of the power plant and substation and the main factors of technical performance, the reasonable design of the main wiring directly affect the security and stability of system and the economic and reliable; Ensure all sorts of electric equipment should satisfy the stability of the rated voltage and rated current conditions; Wire respectively from two aspects of material and sectional area, choose according to different needs of different kinds of wires。 Eventually make the whole design a system to meet reliability, flexibility, and operation of the economy。
Keywords: A system, The main connection, The main equipment, Wires
目 录
1 绪论 3
1。1 简述我国电力工业发展历程以及前景 3
1。2 我国热电厂规模 3
1。3 本设计所要求主要工作 5
2 发电厂电气主接线设计 5
2。1 主接线的设计原则和基本要求 5
2。1。1 主接线的设计原则 5
2。1。2 主接线设计的基本要求 5
2。2 主接线设计 7
2。2。1 主接线设计步骤 7
2。2。3 各类电气主接线 8
2。2。4 35kV 侧主接线设计 8
2。2。5 220kV 侧主接线设计 8
2。2。6 主接线方案的比较选择 9
3 短路电流计算 。。。。。。。。。。。。。。。。。。。。。。。。。 错误!未定义书签。
3。1 短路产生原因 。。。。。。。。。。。。。。。。。。。。。。。 错误!未定义书签。
3。2 计算短路电流目的 。。。。。。。。。。。。。。。。。。。 错误!未定义书签。