设计总说明1 设计题目来源本课题拟让学生通过设计通联大厦二期的舒适性空调系统,使学生掌握空调系统的设计过程,并熟练掌握用计算机绘图的方法与技巧,使学生分析问题和解决本专业工程实际问题。41153
根据教师提供的建筑平面图,结合本地的气象基础数据,学生应掌握空调冷负荷计算、空调系统形式选择、空气处理过程设计、主要设备选型,以及空调风、水系统的设计等主要技术。最后,绘制设计图纸,图纸内容应能较好表达设计意图,图纸深度应接近施工图水平。
2 工程概况
本设计针对通联大厦二期空调系统。标准层高3.6m,建筑主体结构为框架结构,建筑面积6300.89m2,空调面积3517.35m2,有餐饮、生活配套、会议室、等房间。
3 设计内容
根据建筑平面图,结合本地气象基础数据,对通联大厦二期的设计如下:
(1)空调冷热负荷计算;
(2)空调系统的方案的比较与选择;
(3)末端设备的选型;
(4)空调风系统的设计与水力计算;
(5)空调水系统的设计与水力计算;
(6)排风及防排烟设计;
(7)其他设备的选择;保温、减振和消声等内容。
4 设计主要工作论文网
完成所在区域的空调系统负荷计算。根据房间负荷、房间功能结合建筑平面图选择空调系统形式。然后进行末端设备的选型与布置。接着进行空调风系统、水系统设计,包括风管、水管管路布置、风口形式选择等。再进行风系统水系统的水力计算。最后绘制设计图纸与撰写设计说明书。
Design of air conditioning system for Tonglian Building
The general illustrate of design
1 source of design problems
This project intends to let the students through design communications building, the second phase of the comfort air conditioning system, to enable students to master the design process of the air conditioning system and skilled master the methods and techniques of computer graphics, enable the student to analyze the question and solve the practical engineering problems.
According to teachers to provide the construction plan, combined with local meteorological data, students should master air-conditioning cooling load calculation, air conditioning systems, air handling process design, selection of main equipment, and air system, water system design. Finally, drawing the design drawings, drawings should be able to better express the design intent, drawing depth should be close to the level of the construction drawing.
2 Engineering Survey
The design for the two air conditioning system communications building. Storey 4.2m, the main structure of the building as a frame structure, the construction area of 3517.35m2, air conditioning area of 6300.89m2, there are dining, living facilities, meeting rooms, and other rooms.
3 design content
According to the construction plan, combined with the local meteorological data, as of the two phase of the building design:
(1) Air conditioning cooling load calculation;
(2) Comparison and selection of air conditioning system;
(3) Selection of terminal equipment;
(4)Design and hydraulic calculation of air conditioning system ;
(5)Design and hydraulic calculation of air conditioning water system (5);
(6) Exhaust ventilation and smoke control design;
(7) The choice of other equipment; insulation, vibration and noise reduction and other
content.
4 design main work
Load calculation of air conditioning system in the area where the area is located. According to the load of the room, the function of the room and the building plan, the form of the air conditioning system is selected. And then the selection and arrangement of the terminal equipment. Then the air conditioning system, water system design, including the wind pipe, pipe line arrangement, the choice of the form of wind, etc.. The hydraulic calculation of the water system of the air system and the design of the ventilation and smoke control. At last, draw the design drawing and write the design specification. 通联大厦二期空调系统设计+计算书+CAD图纸+答辩PPT:http://www.youerw.com/gongcheng/lunwen_41119.html