摘要: 本次设计为团队任务,由小组三人共同完成,团队课题为:源凯国际商业街BIM虚拟建造。本人主要做的工作有:源凯国际商业街的REVIT结构.建筑模板的建模,之后用鲁班软件进行钢筋和土建的建模,编制进度计划,施工场地布置,编制源凯国际商业街应用BIM技术的技术标,并将进度计划与三维模型行进关联分析。47048
毕业论文关键词: BIM ; 技术标编制 ;进度计划 ;施工组织设计
YuanKai International Commercial Street BIM technology technical proposal establishment
Abstract: This design for the team work, by the team three people together to complete, the team project is: YuanKai international commercial street BIM virtual construction. I mainly do the job: YuanKai International Business Street of Revit structure. Modeling of the building template, followed by Luban software modeling of reinforced and civil, schedule planning and layout of construction site and the technology of preparation of YuanKai International Commercial Street in the application of BIM Technology Standard, and schedule and 3D model association analysis
Key words: BIM; technical standard; schedule; construction organization design
目录
1 源恺国际商业街BIM虚拟建造设要求..................................1
1.1 课题内容要求..................................................1
1.2 课题软件要求..................................................1
2 源恺国际商业街BIM虚拟建造设计介绍................................2
2.1 团队课题介绍..................................................2
2.2 源恺国际商业街工程概况........................................2
2.3 BIM软件应用...................................................3
2.3.1 Revit 建模软件............................................3
2.3.2 鲁班土建软件..............................................3
2.3.3 鲁班钢筋软件..............................................3
2.3.4 鲁班造价软件..............................................3
2.3.5 鲁班M C软件..............................................3
2.3.6 Rroject 进度计划软件......................................4
3 源恺国际商业街BIM设计操作过程...................................4
3.1 源恺国际商业街BIM建模步骤....................................4
3.2 源恺国际商业街工程算量步骤....................................9
3.2.1 鲁班土建软件介绍..........................................9
3.2.2 土建算量的依据和方法.....................................10
3.2.3 鲁班土建软件主要操作流程.................................11
3.3 源恺国际商业街工程计价步骤...................................13
3.3.1 计价的定义与特征.........................................13
3.3.2 清单计价与定额计价的区别.................................14
3.3.3 鲁班造价软件主要操作流程.................................14
4 设计过程问题分析................................................14
4.1 鲁班土建模型整合问题分析.....................................14
4.2 技术标编制问题分析...........................................16
5 Revit2014建模与鲁班建模对比.....................................18
6 源恺国际商业街应用BIM技术的技术标编制小结.......................19
7 附件-源凯国际商业街桩基础方案
源恺国际商业街应用BIM技术的技术标编制 1 源恺国际商业街BIM 虚拟建造设计要求 源恺国际商业街应用BIM技术的技术标编制:http://www.youerw.com/gongcheng/lunwen_48973.html