菜单
  

    earthquake;  (d) spalling of concrete cover (East side); (e) joint
    foundation-S1 (West side); (f) joint S1-S2 .192
    Figure 5.4.6.  Specimen C8P after cyclic loading test (West side) ..193
    CHAPTER 1
    INTRODUCTION 
    1.1 Motivation 
    Over the past few years, growing attention has been given to the investigation,
    development and application of precast concrete bridge elements and systems for
    highway bridges. Traditional cast-in-place concrete bridge construction projects normally
    cause traffic disruption for long periods of time. The cost of this disruption to road users
    can be very high in busy urban areas. Precast concrete bridge construction offers a viable
    solution to the problem. It shifts most of the construction activities away from the
    construction site and into precast factories where quality control is more reliable. After
    adequate concrete strength has been obtained, precast concrete products are transported to
    construction sites and assembled within a short period of time, thus minimizing traffic
    disruption. Reducing on-site construction activities also means that work zone safety can
    be improved and construction quality maintained, since the work environment in a
    precast factory is safer and easier for workers to perform their jobs in terms of formwork,
    reinforcing ironwork, concreting, compacting and curing. In addition, environmental
    impact is reduced, since the demand on the land for construction purposes around the site
    is decreased.  The disadvantages of using precast bridge construction as  opposed to cast-in-
    place bridge construction include high initial cost and uncertainty about the performance
    of precast connections or joints. High initial  cost is largely attributed to transporting
    precast products from factories to construction sites and the additional hardware needed
    for precast connections. In many cases, these higher costs may become less important if
    the many benefits of using precast bridge construction are appropriately weighed.
    However, unless the performance of precast connections can be ensured, engineers will
    hesitate to use precast bridge construction. As a result, the development of any new
    method of precast bridge construction will require rigorous research on the design details
    of precast connections to ensure that they will perform as expected over the lifetime of
    the bridge.     
    Numerous bridge construction projects have successfully used precast concrete
    construction in superstructures or substructures or both. Examples can be found in
    FHWA (2006). Most precast segmental concrete column and pier construction in the U.S.
    is used in areas of low seismicity, as shown in Figure 1.1.1, such as the states of Texas
    and Florida. Some well-known examples include the Seven Mile Bridge, Sunshine
    Skyway Bridge, Mid-Bay Bridge, and John T. Collinson Bridge in Florida and the
    Louetta Road Overpass and U.S. Highway 183  Elevated in Texas.  Precast bridges in
    other states include the Linn Cove Viaduct  in North Carolina, C&D Canal Bridge in
    Delaware, Varina-Enon Bridge in Virginia, U.S. Highway 70 at Vail Pass in Colorado
    (Muller and Barker 1985, Billington et al. 1999 and Figg and Pate 2004), and more
    recently, Victory Bridge in New Jersey  (NJDOT 2005 and ASBI 2004) and Colorado River Bridge of Hoover Dam Bypass in Nevada (Structure Magazine 2006 and ASBI
    2006). Photos of these bridges are shown in Figure 1.1.2. In regions of high seismicity,
    such as the state of California, there has not been any application of segmental column or
    pier construction (FHWA 2006). One important reason for this situation is that there is
    limited knowledge about the seismic behavior of segmental columns and piers, in
    particular, the seismic behavior of the segment joints in segmental columns and piers.
  1. 上一篇:浸涂机英文文献和中文翻译
  2. 下一篇:蒸馏塔英文文献和中文翻译
  1. 汽车内燃机连杆载荷和应...

  2. 机械手系统英文文献和中文翻译

  3. 固体氧化物燃料电池英文文献和中文翻译

  4. 船舶运动仿真系统英文文献和中文翻译

  5. 新能源空调系统设计英文文献和中文翻译

  6. 正交试验回归法和响应曲...

  7. 机械设计制造及其自动化英文文献和中文翻译

  8. NFC协议物理层的软件实现+文献综述

  9. 高警觉工作人群的元情绪...

  10. 中国传统元素在游戏角色...

  11. 浅析中国古代宗法制度

  12. g-C3N4光催化剂的制备和光催化性能研究

  13. C++最短路径算法研究和程序设计

  14. 上市公司股权结构对经营绩效的影响研究

  15. 现代简约美式风格在室内家装中的运用

  16. 江苏省某高中学生体质现状的调查研究

  17. 巴金《激流三部曲》高觉新的悲剧命运

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回