Performance Measures

Table 2 summarises performance measures appearing in papers. Flowtime related measures have attracted the most attention, followed by tardiness related measures and utilisation related measures.

2.3 Review of  Related Publications

Nof et al. [44] studied the control problem in an FMS. Three rules were considered for part releasing into the empty system, and two rules for part releasing into the loaded system. Two performance measures were employed, which were system utilisation  and  production  rate.  Their  work  showed  that   the

Table 2. Performance  measures  used  in general  FMS scheduling  studies.

and RANDOM. Six performance measures, which are station utilisation, production rate and average throughput time  for each part type, simulation time, total number of parts produced, and total processing time, were used in this study. The effect of transporter speed and capacity on production rate and station utilisation were discussed. It was concluded that the SPT rule was the best rule, as it resulted in higher production, higher utilisation, shorter  throughput time,  and less  congestion  in the system. Neither due-date assignments nor due-date-based measures of performance were employed in the simulation model.

Bell and Bilalis [46] investigated a real FMS consisting of three machines using a digital simulation. Only one decision point was considered in the simulation model. They  explored the effect of three dispatching rules (SIO, LIO, and FIFO) on machine utilisation  and  throughput times.  Due-date-based rule

  and  related  measure  of  performance  were  not  considered  in

Performance Number of Reference  number Period measures publications of publications

Flow-time 36 [4],  [23], [25], 1979–2000

related [27],  [28], [32],

[36],  [44], [46–

48],  [50–56], [58–

63],  [66–69], [71],

[73–77]  [79], [80]

Tardiness or 19 [23],  [27], [28], 1983–2000

tardy  job related [36], [47–49],

[59],  [60], [62],

[70],  [71], [73–

75],  [77], [79–81]

Utilisation 17 [25],  [27], [32], 1979–1995

related [36],  [44], [46],

(including [49–52], [54–57],

system, machine, [60],  [73], [74] station, etc.)

Cost related 6 [23],  [47], [48], 1983–2000

[70],  [74], [81]

Inventory  related 6 [25],  [36], [54], 1981–1995

[59],  [60], [70]

Others 12 [25],  [32], [34], 1981–1995

[36],  [50], [51],

上一篇:水辅助注塑系统英文文献和中文翻译
下一篇:连杆机构英文文献和中文翻译

数控机床制造过程的碳排...

机械手系统英文文献和中文翻译

船舶运动仿真系统英文文献和中文翻译

新能源空调系统设计英文文献和中文翻译

机械设计制造及其自动化英文文献和中文翻译

齿轮平行转子系统英文文献和中文翻译

蜂窝移动通信系统英文文献和中文翻译

张洁小说《无字》中的女性意识

互联网教育”变革路径研究进展【7972字】

安康汉江网讯

老年2型糖尿病患者运动疗...

LiMn1-xFexPO4正极材料合成及充放电性能研究

新課改下小學语文洧效阅...

网络语言“XX体”研究

麦秸秆还田和沼液灌溉对...

我国风险投资的发展现状问题及对策分析

ASP.net+sqlserver企业设备管理系统设计与开发