This topic comes as the Shanghai modern architectural design groupShenyuan geotechnic Engineering Co. Ltd. currently assumed, Baosteelcultural center expansion project design of foundation pit project.
2 Engineering Survey
(1) of Baosteel cultural center expansion project site in Baoshan District City,east of Bao Lin Er Cun from about 16 meters, the south from the Po Yang road about 22 meters away from Mudanjiang, on the west side of the road about 22 meters, north from Po Lam Road about 10 meters, undergroundpipeline (water supply, sewage, information, mainly concentrated around Yu Shui) below the pavement, and across the road is the building..
(2) the base pit ± 0.000=+4.500, peripheral surface relative elevation is -0.700, consider the 100mmC15 plain concrete cushion. The foundation cushion bottom relative elevation is -14.700~-11.900 (bottom). The excavation depth is 11.200m. Well, bureau of tribal depth is 2.200m~3.500m, the excavation depth is 12.700~14.000m.
3 retaining structure system
(1) retaining structure of double row bored pile + biaxial cement mixing pilediameter 700@1000 water. See the pit floor plans, profiles.
(2) according to the depth of excavation and surrounding environment, bored pile diameter Φ 1000@1200 Φ were used, 1050@1250, Phi 1150@1350, and phi 1200@1400. Concrete design strength grade of C30 (water
(3) the Foundation Pit Water Council tribe deep regions using biaxial cement mixing pile diameter 700@500 and pressure grouting reinforcement. At the same time along the pit side setup multiple biaxial Φ 700@500 pier reinforcement. See the pit plane layout and section map
(4) the project set up three reinforced concrete support, the first center elevation -2.100, support section for 900 x 800, reinforced concrete linksection for 700 x 700, reinforced concrete purlin by section 1300 x 800. The second center elevation -7.100, support section for 1000 x 800, reinforced concrete link section for 800 x 700, reinforced concrete purlin by section 1400x 800. Concrete design strength grade of C30. Concrete protective layerthickness, on the left, the right to 30mm, side 50mm.
(5) biaxial cement mixing pile diameter 700@500, the overlapping of 200,using P32.5 ordinary portland cement, water cement ratio 0.5, cement contentis 8% in the pit bottom or between the first support, following the pit bottom is 13%.
(6) the ratio of cement grouting: water glass =1:0.02, water cement ratio 0.5,per cubic reinforced soil cement 150kg.
4 Pit proposed vacuum of deep well water
Pit proposed vacuum of deep well water, guarantee that the water level dropped to the bottom under 0.5 ~ 1.0 meters, charged the same time should ensure the depths (such as a deep ditch catchpit) to the bottom under 0.5 meters. Bottom Strengthening regions at the same time should ensure charged depths (Set wells deep ditch) to the bottom under 0.5 meters. Bottom Strengthening District over soil excavation needs can be met, and in the excavation 15 days ago; pit precipitation expected to be monitoring the pit water level changes, pit precipitation should not affect the pit water level changes According to the monitoring of the construction of precipitation adjustment.
5 Monitoring a construction pit
(1) During construction, we should strengthen monitoring, problems promptly notify the relevant parties consultations. The contents of the proposed monitoring : Column top of the pile, and retaining top of the pile near the buildings, pipelines level vertical displacement; Retaining pile of lateral (inclinometer); Hang outside the water level monitoring; supporting axial force. Pit monitoring program required by the building envelope design units approved and before implementation.
(2) Observation and warning requirements : Construction of the enclosure, to be detected early reading;precipitation and the excavation pit, have to do a test on the 1st;measured data should be promptly reported to buyer and Design Institute;Alarm Limits : horizontal, Vertical displacement greater than 3 mm/d or cumulatively more than 30 mm, Hang outside the groundwater level dropped to 500 mm;the deformation limits to the police after the tests should increase the frequency and timeliness and Design Contact three homes; urrounding pipelines, and the nearby housing deformation value in accordance with the relevant police departments to determine the requirements.
- 上一篇:上海浦东南路1540号地块办公楼建筑设计
- 下一篇:大型购物中心地上商业中心消防设计+CAD图纸
-
-
-
-
-
-
-
上市公司股权结构对经营绩效的影响研究
中国传统元素在游戏角色...
巴金《激流三部曲》高觉新的悲剧命运
NFC协议物理层的软件实现+文献综述
江苏省某高中学生体质现状的调查研究
g-C3N4光催化剂的制备和光催化性能研究
C++最短路径算法研究和程序设计
现代简约美式风格在室内家装中的运用
高警觉工作人群的元情绪...
浅析中国古代宗法制度