摘要:“十三五”期间,为进一步加强港口开发,计划建设2个1.5万吨集装箱码头,以提高港口核心竞争力。本设计的集装箱码头位于湛江宝满港区。湛江位于雷琼火山群地带,地质条件良好,水深较深,该地区位于广州湾内,波浪掩护条件好,素以天然深水良港著称。码头结构型式采用重力式沉箱结构。
参考相关资料,结合有关的规范条文,查阅专业书籍,本设计的主要内容包括:总平面布置设计、沉箱结构的设计和码头荷载计算、码头结构稳定性验算、结构内力计算、沉箱配筋、裂缝宽度验算及编写施工组织设计等。根据计算内容,采用CAD制图软件绘出总平面图,沉箱结构图,沉箱平面、立面图,配筋图等。
查找码头的设计资料,根据码头的资料确定码头的各项指标,在以此一步步的校核码头的设计结果,保证码头设计的合理性。
关键字:集装箱;沉箱码头;总平面布置;结构设计
Abstract:"13th Five-Year" period, in order to further strengthen the port development, plans to build two 15,000 tons container terminal, in order to improve the port's core competitiveness.
The design of the container terminal is located in Zhanjiang Baoman port area. Zhanjiang is located in the Lei Qiong volcanic zone, good geological conditions, deep water depth, the area is located in Guangzhou Bay, for the wave cover conditions are good, known as natural deep water port. So the terminal structure type using gravity caisson structure.
The main contents of this design include general layout design, design of caisson structure and calculation of terminal load, calculation of stability of terminal structure, calculation of internal force of structure, caisson reinforcement, crack Width checking and preparation of construction organization design. According to the calculation content, using CAD drawing software to draw the total plan, caisson structure, caisson plane, elevation map, reinforcement map and so on.
Find the design information of the terminal, according to the pier information to determine the terminal of the indicators, in this step by step check the terminal design results to ensure the rationality of the terminal design.
Keywords: container;Caisson terminal;Total layout;Structural design
目 录
第一章绪论1
1.1湛江港口的发展历程1
1.2湛江集装箱码头的重要性..1
1.3设计依据.2
第二章设计资料.3
2.1港口地理位置3
2.2气象4
2.2.1气温4
2.2.2降水4
2.2.3风况4
2.2.4波浪5
2.3水文、水文..6
2.4地形、地貌和工程泥沙..6
2.4.1地形、地貌6
2.4.2地质特征概述.7
2.4.3港区地质分层及物理性质7
2.5地震..8
2.6年运量8
2.7设计船型.8
第三章总平面布置..9
3.1总平面布置原则.9
3.2泊位数的确定9
3.3码头水域布置..10
3.3.1码头前沿设计水深..10
3.3.2船舶制动水域11
3.3.3船舶回旋水域11
3.3.4码头前沿停泊水域..11
3.3.5港池布置.11
3.3.6锚地布置.11
3.3.航道尺寸与布置..12
3.4码头陆域尺度..13
3.4.1码头泊位长度及码头岸线总长.13
3.4.2码头前沿高程14
3.4.3码头前沿作业地带..14
3.4.4库场面积.15
3.4.5集装箱码头大门所需车道数16
3.4.6港区道路布置17
第四章装卸工艺布置.18
4.1装卸工艺的设计原则及一般要求.18
4.1.1一般规定.18
4.1.2装卸工艺的方案及机械设备选型..18