菜单
  
    摘要本次设计主要是编制招标控制价,工程为某商业广场17#楼,17#楼为带商业网点的6层住宅楼。本工程建筑占地(基地)面积为875.78平方米;本工程总建筑面积为3554.41平方米,阳台按一半计算,无柱雨篷,装饰柱、凸窗、空调板不计建筑面积。地处安徽省,本工程为多层居住建筑(带商服),建筑高度(消防高度)20.69m,地上住宅楼层高一层3.3m,二至六层为3m。商业部分一层层高为4.5m,二层层高为3.3m,耐火等级为二级,屋面防水等级按Ⅰ级设防。结构形式为框架结构;抗震设防烈度为7度;设计耐久年限为50年。在对图纸进行审读、理解后,依据《建设工程工程量清单计价规范》(GB50500-2013)的工程量计算规则,按土石方工程、砌筑工程、混凝土及钢筋混凝土工程、门窗工程、屋面及防水工程、保温隔热防腐工程、楼地面装饰工程、墙柱面装饰工程、油漆涂料裱糊工程等顺序进行工程量计算,综合单价根据《安徽省建筑装饰装修工程》来进行套价,在使用套价后得到的综合单价乘以相对应项目的定额工程量,得出此部分的分部分项工程量合价,以《安徽省建设工程费用定额》(2009)为依据计算措施项目与其他项目。最终得到建筑与装饰工程的总造价。46151
    毕业论文关键词:招标控制价;清单计价;工程量;综合单价
    ABSTRACT This design is mainly for the preparation of tender control price, the project for a commercial plaza, 17# building, 17# floor for the 6 storey residential building with commercial outlets. The project construction area (base) area of 875.78 square meters. This project has a total construction area of 3554.41 square meters, the balcony by half, no column awning, decorative columns, bay windows, air conditioning board excluding the construction area. Located in Anhui Province, the project is a multi-storey residential building (with commercial service), the height of the building (fire height) 20.69m, the floor of the ground floor of a high level of 3.3m, two to six layers of 3m. Commercial part of the high level of 4.5m, two layers of high for the 3.3m, the fire resistance rating of two, roofing waterproof grade. The structure form is frame structure, the seismic fortification intensity is 7 degree, the design durability period is 50 years. In reading, to understand the drawings, according to the "construction engineering quantity list valuation standard" (GB50500-2013) calculation rules of the project, according to the earthwork, masonry, concrete and reinforced concrete engineering, doors and windows, roofing and waterproofing, heat insulation corrosion engineering, ground floor decoration, wall decoration engineering cylinder paint, deckman order quantity calculation, comprehensive unit price according to the "Anhui province construction decoration engineering" to set the price, in the use of a comprehensive price multiplied by the price after the corresponding to fixed quantity, the project quantity price in this part of the "Anhui province construction cost quota" (2009) to calculate measures of project and other projects as the basis. Finally, the total cost of construction and decoration works is obtained.
    Key words: tender control price; pricing; engineering quantity; comprehensive unit price
    目  录
    第一章  设计简介    1
    1.1设计依据    1
    1.2项目的基本情况    1
    1.3编制流程    2
    第二章 工程量计算    3
    2.1概述    3
    2.2建筑分部分项工程量计算    4
    2.3装饰分部分项工程量计算    18
    2.4措施项目计算    21
    第三章 定额套用    22
    3.1清单项目综合单价    22
    3.2一般项目定额套用    22
  1. 上一篇:南京京门府地产营销策划报告+SWOT分析
  2. 下一篇:苏州职业学校6层学生宿舍建筑与结构结构设计+CAD图纸
  1. 镇江市某住宅楼工程计价与BIM应用

  2. EPC总承包项目的风险管理研究

  3. 内蒙古某商业广场空调系统设计+CAD图纸

  4. 宝山U天地项目商业综合体...

  5. 商业办公中心消防设计

  6. 某商业广场消防设计

  7. 湖州市某商业楼的空调通风工程设计

  8. 现代简约美式风格在室内家装中的运用

  9. g-C3N4光催化剂的制备和光催化性能研究

  10. 高警觉工作人群的元情绪...

  11. 江苏省某高中学生体质现状的调查研究

  12. C++最短路径算法研究和程序设计

  13. 巴金《激流三部曲》高觉新的悲剧命运

  14. 浅析中国古代宗法制度

  15. 上市公司股权结构对经营绩效的影响研究

  16. 中国传统元素在游戏角色...

  17. NFC协议物理层的软件实现+文献综述

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回