摘要上海浦东某码头位于上海东端,浦东区包括黄浦江以东到长江口之间的三角形区域。随着改革开放以来,中国经济不断的发展,北、上、广是我国经济发展的三大城市,其中上海位于我国长江三角形口,在与外交方面,必然是我国有利的地方,它东临海,内连长江,交通非常便利,随着经济的不断发展,需求量也不断的增加,所以进口出口货物都大量上涨,于是各方面都有发展,上海港区发展对我国经济发展很重要,是我国对外联系和南北货物运输的中转,港口中的运货量增大,为了满足需求,现要建立一个码头,此码头主要运输低危品,根据当地的地质资料和水文情况,选择建立一个高桩码头,采用梁板式高桩码头。62308
本次码头的设计主要是对码头所受的荷载作用进行确定,根据荷载作用对码头的结构构件进行计算、验算他的合理性,主要的计算内容有面板内力、弯矩、剪力、配筋的计算;纵梁的计算和验算,纵梁分为轨道梁和普通纵梁;横梁的计算和验算;桩基的检验计算。其中计算时,纵梁、横梁、桩基等要借助易工软件辅助计算。
毕业论文关键词:集装箱高桩码头、面板、纵横梁、桩基
Abstract Shanghai Pudong terminal is located in the east end of Shanghai, including Pudong District East of Huangpu River to the Yangtze River Estuary between triangle region. With the reform and opening up, China economic development, the north, on the wide and is the three largest city in China's economic development, in which Shanghai is located in China's Yangtze River Delta, and in foreign affairs, is the inevitable result of China's favorable place, it even in East Linhai, the Yangtze River, the traffic is very convenient, with the continuous development of the economy, demand is also constantly increasing, so a large number of imported or exported goods are rising, so all aspects of development, Shanghai port development is very important for the economic development of China, is China's foreign relations and South transit cargo transportation, cargo ports increases, in order to meet the demand, we must establish a the main pier pier, low transport of dangerous goods, according to the geological data and local hydrological situation, choose to build a high pile wharf, the pile wharf.
Design of the wharf is mainly on the pier load is determined according to the load of wharf structures of calculation, checking his rationality, the calculation of the main content is panel force, moment, shear, reinforcement calculation; beam calculation and checking, the longitudinal beam is pided into orbit girder and beam; beam calculation and checking; inspection of pile foundation calculation. The calculation of longitudinal beam and pile foundation, etc. by easy software aided calculation.
Keywords: high pile wharf,of container plate, beam, pile foundation
第一章 绪 论 1
1.1 上海港历史发展及其现状 1
1.2上海地理位置 2
第二章 设计资料 3
2.1营运资料 3
2.1.1货运任务 3
2.1.2船舶资料 3
2.2自然条件 3
2.2.1设计水位 3
2.2.2水文 3
2.2.3 气象 4
2.2.4 地形地质 4
2.2.5地震烈度 4
第三章 码头平面布置 5