摘要本工程为上海市某综合楼,建筑面积约为44600平方米。建筑地下一层,地上三十二层,其中地下一层平时为设备用房、地下汽车库,一到四层为办公、娱乐等公共场所,五和二十层为避难和设备用层其余楼层均为酒店住宅区,是办公接待和住宅为一体的高层建筑。65279
本设计采用吸收式机组作为空调冷热源。空调方式,高大空间如商场、西餐厅、活动用房等采用全空气系统,长住客房、宾馆客房等采用了风机盘管加独立
新风系统。全空气系统选用方型散流器平射流形式,而风机盘管加独立新风系统
有百叶风口侧送的形式。水系统采用闭式水平同程垂直异程。卫生间通风统一由
排风扇接出,在末端安装止回阀。楼梯电梯间采用正压送风系统;中庭采用机械排烟系统。
毕业论文关键字:全空气系统 风机盘管 新风系统 水系统
毕业设计说明书(论文)外文摘要
Title The air condition system design for a building in Shang Hai
Abstract
The topics for graduate design a comprehensive building in Shang Hai
air-conditioning design, construction area of about 44600 square meters. The building has a layer of the ground floor, thirty-two floors on the ground, the underground layer is usually for the equipment room, underground garage, one to four layers for the office, entertainment and other public places, the five and the twenty layer is the refuge and equipment layers the rest floors residential area for hotel, office and residential reception as one of the top building.
This design uses the absorption chiller as the cold and heat source. Air conditioning, large space such as shopping malls, restaurants, activities room, use the entire air system, living rooms, hotel rooms adopt fan-coil unit plus fresh air system. All air system choose square diffuser jet form, and the fan - coil and independent new wind system Baiye outlet side to send the form. The closed level with different process water system adopts vertical. The toilet ventilation unified by the exhaust fan is connected, the check valve installed in the terminal. The stairs Elevators use of positive pressure air supply system; the mechanical smoke exhaust system.
Keywords All air system Fan coil air system Fresh air system Water system
目录
1 概论 1
1.1 工程概况 1
1.2设计依据 1
1.2.1 设计目的 1
1.2.2设计任务及要求 1
1.2.3 设计范围 1
1.2.4 设计规范与标准 1
2 空调负荷计算 2
2.1 空调室内、外计算参数 2
2.1.1 室外空气设计参数 2
2.1.2 空调室内空气计算参数 2
2.1.3 土建资料 2
2.2 空调新风量的确定 3
2.3 空调冷负荷计算 3
2.3.1 围护结构瞬变传热引成的冷负荷 3
2.3.2 透过玻璃窗的日射得热引成的冷负荷 3
2.3.3 室内热源散热引成的冷负荷 4