摘要:本次设计的课题为:本次设计为一个团队设计,模型建立阶段由 4 名同学共同完成,本人负责的是 5#楼的土建,钢筋建模,在计算设计阶段,本人负责施工进度计划的 编制,并编写脚手架和模板的专项方案。通过鲁班 plan 软件将进度计划与模型、造价相 关联,完成施工过程的 5D 模拟,通过模拟可读出施工的每个阶段其造价和工程量,直观 方便,为项目管理人员进行施工过程管理提供依据张江东久 2-5#楼基于 BIM 的施工过程 管理,课题的主要任务是运用 BIM 技术完成对张江东久 2-5#楼项目的建模、施工平面图 的布置、编写施工进度计划以及施工过程的 5D 模拟。设计所应用的软件主要有鲁班软件 中的鲁班钢筋、鲁班土建、鲁班 plan、鲁班场布、鲁班 MC 以及 Microsoft Project。68704
毕业论文关键词: BIM;鲁班;施工过程管理
Construction Management of BIM Based on Zhangjiang Dongjiu #2-5 Building
Abstract: This design is a team design, the model establishment phase by four students to complete, I am responsible for the 5 # building civil engineering, steel modeling, in the design design stage, I am responsible for the construction schedule preparation, and the preparation of scaffolding and Template special program. Through the Luban plan software will be the schedule and model, cost associated with the completion of the construction process 5D simulation, through the simulation can be read at each stage of the construction cost and engineering, intuitive and convenient for the project management personnel to provide the basis for the construction process management The design of this project is: Zhang Jiangdong long 2-5 # building based on BIM construction process management, the main task is to use BIM technology to complete the Zhangjiang East Building 1 project building modeling, construction plan layout, the preparation of construction Schedule and 5D simulation of the construction process. Design of the application of the software mainly Luban software in the Luban steel, Luban civil, Luban plan, Luban MC and Microsoft Project.
Key words: BIM;Luban;construction process management
目录
1 前言 1
1.1 选题背景 1
1.2 选题依据 1
2 张江东久 2-5#楼工程概况 2
2.1 综述 2
2.1.1 工程概况 2
2.2 工程地质概况 3
2.3 其他 5
3 团队介绍: 6
3.1 毕业设计的目的: 6
3.2 团队工作分配: 6
4 BIM 软件应用 7
4.1 鲁班建模软件 7
4.2 鲁班钢筋 7
4.2.1 鲁班钢筋软件简介 7
4.2.2 鲁班钢筋软件操作流程 7
4.3 鲁班土建 9
4.3.1 鲁班土建软件简介 9
4.3.2 鲁班土建软件操作过程 9
4.4 Microsoft project 11
4.4.1 Microsoft project 的简单介绍 11
4.4.2 Microsoft project 操作流程 11
4.5 鲁班 plan