菜单
  

        The main route for the treatment is sewage flow through the medium grill, then flow into
    pumping station, and then flows through a fine grid, aerated grit chamber,then it flows
    through the primary settling tank, anaerobic anoxic oxic biological reaction tank, secondary
    sedimentation tank, disinfecting tank, finally it flows through PAP metering tank pour into class
    water. The main route for the treatment is sludge from the reactor sludge concentration
    delivered by the sludge pump directly to the sludge thickener,sludge dewatering house
    dehydrated ,and finally sinotrans disposal.The ground elevation of 0.00m,highest water
    level is 11.518m.The various pollutants removal is CODcr,55%;BOD5,85%;SS,92%;NH3-N,
    51;TN,67%;TP,83.3%.The total investment cost of the wastewater treatment plant is 209.2878
    million yuan, and the operating costs the treatment costs  is 0.59 yuan every ton. The design
    of the sewage treatment plant structures, process flow, and elevation and layout
    preliminary design.
    Keywords: Nitrogen and Phosphorus Removal; AAO process; Process design;
    Sewage Treatment  
    目  录
    1绪论    1
    1.1 设计任务及依据    1
    1.1.1 设计任务    1
    1.1.2 设计水量    1
    1.1.3 设计依据    2
    1.2 设计原则及意义    2
    1.2.1 设计原则    2
    1.2.2 设计意义    3
    2设计工艺选择    4
    2.1 AB工艺    4
    2.2 阶段曝气活性污泥法    4
    2.3 氧化沟工艺    5
    2.4 AAO工艺    6
    2.5 工艺比较与选择    6
    3处理工艺设计    9
    3.1 中细格栅的设计    9
    3.1.1格栅的设计参数    9
    3.1.2中格栅的计算    9
    3.1.3 细格栅的计算    12
    3.2 进水泵房    15
    3.2.1 泵房设计的条件    15
    3.2.2 泵房的计算    15
    3.3曝气沉砂池    16
    3.3.1 曝气沉砂池设计参数    16
    3.3.2 曝气沉砂池的计算    17
    3.4 配水井    19
    3.5 初沉池    20
    3.5.1初沉池的参数    21
    3.5.2 初沉池池的计算    21
    3.6 A2O工艺    24
    3.6.1 A2O生物反应池设计参数    24
    3.6.2 A2/0生物反应池的尺寸计算    25
    3.6.3 反应池进、出水系统计算    28
    3.7 鼓风机房    31
    3.8 二沉池    32
    3.8.1 二沉淀池的参数    32
    3.8.2 二沉池的计算    32
    3.9 接触消毒池    37
    3.9.1 接触消毒池的设计参数    37
    3.9.2 接触消毒池的计算    38
    3.9.3 加氯间    39
    3.9.4 接触消毒池的管路计算    39
    3.10 污泥泵房    40
    3.10.1 二沉池回流污泥    40
    3.10.2 混合污泥    40
    3.11 污泥浓缩池    41
    3.11.1 污泥浓缩池设计参数    41
    3.11.2 污泥浓缩池的计算    41
    3.12 污泥脱水机房    44
    4污水处理厂总体布置    46
    4.1平面布置    46
    4.1.1 平面布置的原则    46
    4.1.2 平面布置    46
    4.2 高程布置    46
    4.2.1 高程布置原则    46
    4.2.2 高程布置    47
  1. 上一篇:年产5亿片马来酸依那普利车间工艺设计+CAD图纸
  2. 下一篇:1,6-己二醇双缩水甘油醚的合成与表征
  1. 日处理10万立米城市污水深度处理工艺设计

  2. 日处理15万立方米城市生活污水处理工艺设计

  3. 日处理2500立米果汁饮料厂...

  4. 2500立米高炉煤气除尘系统设计+CAD图纸

  5. 1080立米高炉富氧喷煤经济评价模型研究

  6. 日处理12万立米城市生活污...

  7. 日处理2万立米城市污水厂...

  8. 浅析中国古代宗法制度

  9. 巴金《激流三部曲》高觉新的悲剧命运

  10. 中国传统元素在游戏角色...

  11. 江苏省某高中学生体质现状的调查研究

  12. 高警觉工作人群的元情绪...

  13. C++最短路径算法研究和程序设计

  14. NFC协议物理层的软件实现+文献综述

  15. g-C3N4光催化剂的制备和光催化性能研究

  16. 现代简约美式风格在室内家装中的运用

  17. 上市公司股权结构对经营绩效的影响研究

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回