1. Duty origin
This design is aims at the Chinese friendship group to carry on the design.Its goal is carries on a chemical design attempt using the chemical engineering related knowledge, and for the Fructone B's industrialization production, process units' design provides the reference.As the simulation design, this article has abbreviated the chemical design partial contents, like craft pipeline design, explosion-proof electrical design, power design and factory whole arrangement and so on.
3. Design standard
This design has referred to following national standards and the stipulation
a.Production process dangerous material and adverse factor classification and code(GB/T13816-1992)
b.Commonly used dangerous chemistry classified standard (GB13690-1992)
c.In pressure vessel chemical mediator model harm and explosion hazard degree classification(HGJ43-1991)
d.Factory fire protection stipulation(GBJ16-1987)
e.Sewage synthesis emissions stipulation(GBJ8978)
f.Steeliness pressure vessel(GB150)
g.Shell type heat interchanger standard(GB151)
h.Craft system arrangement of equipment design stipulation(HG20570)
i.Chemical installment piping arrangement design stipulation (HG/T20549)
4. Principle of design and main design target
Principle : (1)Security :In the chemical production the massive materials are flammable, explosive or virose. Therefore, the design must consider each kind fully obvious and the latent danger, the guarantee production personnels' health and the security.
(2)Ease of operation: While determines each production process and equipment's, but must determine the operating condition reasonably. Because of it to the production process and equipment's establishment and the function display and the control plan's determination, has the direct relation.
(3)Investment province: Namely the request uses the equipment investment, the construction to invest, the public project investment and the manpower cost economically.
(4)Advantageous for the installment: The plant layout should satisfy the construction and the installment work request. Specially should consider that large-scale equipment's hoisting, in the factory path's pavement structure and the load standard and so on should satisfy the work the request.
Basis of calculation :
The year produces 300 tons, the product purity is 99%.
The year working day is 150 days, 30 days carry on the machine overhaul, 5 day of mobility.
Keyword: Fructone B; Cesium carbonate ; Ethyl acetoacetate
目 录
1 总论 1
1.1 概论 1
1.2 文献综述 1
1.3 原料性质 1
1.3.1 乙酸乙酯 4
1.3.2 乙二醇 4
1.3.3 苯 2
1.3.4碳酸铯 2
1.3.5 乙酸 5
1.3.6 纯碱 5
1.3.7 氯化钠 5
1.3.8 钠 3
1.4 水电气的供应说明 3
1.5 工作制度劳动定员 3
2 生产方案的确定 5
2.1 生产流程的论述 5
2.2 生产流程方案的确定 5
2.3 生产流程图简述 6
2.4 本设计特点及存在的问题 6
3 工艺计算 7
3.1 物料恒算 7
3.1.1 车间日产量的计算 7
3.1.2 草莓酯缩合反应的物料恒算 7
3.1.3 草莓酯碱洗分离过程的物料恒算 9
3.1.4 草莓酯饱和食盐水洗及分离过程的物料恒算 12
- 上一篇:金属聚合物复合胶体制备研究+文献综述
- 下一篇:Cu0.6Co0.4Ce4与Cu0.6-Co0.4Ce4在催化氧化CO方面的比较研究
-
-
-
-
-
-
-
C++最短路径算法研究和程序设计
浅析中国古代宗法制度
高警觉工作人群的元情绪...
现代简约美式风格在室内家装中的运用
巴金《激流三部曲》高觉新的悲剧命运
江苏省某高中学生体质现状的调查研究
中国传统元素在游戏角色...
NFC协议物理层的软件实现+文献综述
上市公司股权结构对经营绩效的影响研究
g-C3N4光催化剂的制备和光催化性能研究