摘要:本文通篇以110KV电网工程造价管理全过程业务梳理为主线,以“合理造价”为目标,突出“大建设”体系下造价管理组织架构、业务范围、职责分工的变化和特点,研究分析造价管理的的核心业务和关键管控环节,以及各关键管控环节的造价管理指标需求,并对110KV造价管理指标做出重点分析,有效保证了造价管理工作体系、制度体系、指标体系三大体系的相互配合、协调、衔接。本文110 kv变电站项目成本控制分析计算。43443
毕业论文关键词:110KV;变电站;工程造价;分析
110 Kv SubstationProject Cost Analysis And Calculation
Abstract:Throughout the article to 110kV power grid project cost management in the whole process of the sort of business as the main line, to a "reasonable cost" as the goal, to highlight the "big building" system changes in cost management organizational structure, business scope and responsibilities and characteristics, research and analysis and cost management of the core and key control links, and the key control links of cost management requirements, and focus on analysis of 110kV cost management index, to ensure the effective cost management system, system, index system of mutual cooperation and coordination, convergence. In this paper, 110 kV substation project cost control analysis.
Key Word:110KV; substation; project cost; analysis
目 录
摘要 1
1.引言 1
1.1 研究背景 1
1.2 研究必要性和意义 1
1.3 研究思路、依据、方法 2
1.3.1 研究思路 2
1.3.2 研究依据 2
1.3.3 研究方法 2
2 . 110KV变电站工程 2
2.1 110KV新建变电站工程 2
2.2 110KV变电站的扩建主变工程 6
2.3 110KV变电站扩建间隔工程 7
3.典型技术方案造价水平的分析 9
3.1 110KV新建变电站工程 9
3.2分项费用分析 10
3.3安装工程费变化分析 11
3.4 110KV线路工程总体造价水平分析 12
3.5造价分布区间分析 12
3.6新建变电站工程 13
4. 结论及建议 16
4.1加强工程方案技术经济比选 16
4.2重视规划和前期工作 17
4.3加强初步设计评审管理 17
4.4持续加强队伍建设 17
参考文献 18
110kv变电站工程造价分析与计算1. 引言
1.1 研究背景
在国家完善大建设体系实施后,原有的造价管理组织架构、职责分工、业务流程等均有所调整、发展和完善。按照“加强工程建设管理,强化工程造价管控,规范工程费用管理,结合大建设体系建设实施,强化规章制度执行,实现工程造价管理精益化[1]。”的工作要求,提出相关制度和指标适应性调整建议,充分发挥管理制度体系和指标体系在造价管理工作中的有效监督、合理评价和正确引导作用。 110kv变电站工程造价分析与计算:http://www.youerw.com/zidonghua/lunwen_44278.html