毕业论文

打赏
当前位置: 毕业论文 > 土木工程 >

科技书城B区中央空调系统末端设计(2)

时间:2018-03-26 16:47来源:毕业论文
The graduation design topic is the end of the Central Science Bookstore B zone air conditioning system design, as described above for more than half of the energy consumption of HVAC accounted for the


The graduation design topic is the end of the Central Science Bookstore B zone air conditioning system design, as described above for more than half of the energy consumption of HVAC accounted for the total energy consumption of the building, energy consumption of this part of the most used for heating and cooling system, so the control of energy consumption of cold and heat source system is an important aspect of reducing building energy consumption. Fan coil plus fresh air system is pided into two parts, the central air-conditioning fan coil unit and fresh air system, fan coil is the end of the central air-conditioning equipment, air system cooling load to meet the burden of indoor air quality, fan coil plus fresh air system is an important form of air conditioning water system, the air conditioning form more common is the private building. With the development of modern science and technology and the economy of our country, people's living conditions have improved, and the comfortable request to the living environment of the higher demand for central air conditioning, more and more. The total energy consumption in China's building energy consumption of 27%, and is increasing by 1% every year. In general, fan coil plus fresh air system has the following advantages: (1) flexible control, has advantages of inpidual control, can flexibly adjust the room temperature, according to the room used to determine the status of the fan coil units start and stop; (2) fan coil unit, small size, small occupation of land, convenient layout and installation, and is suitable for the old building; (3) easy to implement the system partition control, cooling and heating load according to the purpose of use, the use of room, time of the system is pided into several regional system, the implementation of zoning control;
The design of each room fresh air load, heating load and moisture load made with precise calculation. By Hongye load calculation software calculated load to hand count check. As chiller selection, selection of pump, hydraulic provides full and accurate basis calculation.
The design of the cooling load is 1691.4KW, this design also focused on the advantages and disadvantages of different air conditioning systems and selection. Then compared the all air system, air - water system, water system, to compare different system from the technical economy and the Shanghai region's energy situation will ultimately determine the cold and heat source system, the design of the selection of fan coil - the air system system forms the most economic and reasonable.
KeyWords:Fan coil; primary air system
目录
1 绪论    1
1.1 我国空调系统的发展现状    1
1.2 空调系统的设计与建筑节能    1
2 设计说明    3
2.1 工程概况    3
2.2 设计依据    3
2.3 设计参数    4
2.3.1 室外计算参数    4
2.3.2室内计算参数    4
2.3.3建筑围护结构材料    4
3 设计方案论证    6
3.1 方案比较    6
3.2 方案的确定    8
4 空调负荷计算    10
4.1负荷构成及计算原理    10
4.1.1 冷负荷    10
4.1.2热负荷    12
4.1.3湿负荷    13
4.2 负荷计算结果    13
5 空气处理方案与设备的选择计算    23
5.1新风处理方案    23
5.2送风量的计算    23
5.3风机盘管的选型    25
6 空调风系统    27
6.1 气流组织计算    27
6.2风管水利计算    28
6.2.1计算步骤    28
6.2.2新风管道尺寸选择    29
6.2.3新风机组选型    31 科技书城B区中央空调系统末端设计(2):http://www.youerw.com/gongcheng/lunwen_11824.html
------分隔线----------------------------
推荐内容