摘要:上海应复中心宿舍楼工程为民用建筑,平面基本成一字形,建筑面积8000㎡;建筑层数为5层;每层高为3.300M;总高16.500m。 结构体系为框架结构+砖混。基础为条型钢筋混凝土基础+红基砖基础。本工程计划于2014年6月10日开工,于2015年5月12日竣工,总工期为336日历天。质量保证措施,施工方案和技术措施,安全措施齐全。对恶劣环境施工和应急情况准备充分。附有施工进度计划表和施工平面布置图。23438
毕业论文关键词:框架结构+砖混,总工期为336日历天
Shanghai Yingfu center dormitory building construction technology standard
Abstract:Shanghai Yingfu center for civil architecture engineering Basic plane into a glyph, building area of 8000 ㎡; Construction layer number is 5; Each storey height of 3.300 M; The total height of 16.500 m. The structure ofFrame structure+Brick concrete structure. Foundation for strip reinforced concrete foundation + red brick base foundation. The project plan to start working on June 10, 2014, completed in May 12, 2015, a total period of 336 calendar days. Quality assurance measures, construction scheme and technical measures, complete security measures. To bad environment construction and emergency situation well-prepared. With construction progress schedule and construction layout.
KeyWords:Frame structure+Brick concrete structure, a total period of 336 calendar days
目录
1工程概况 7
1.1 工程名称 7
1.2 工程地点 7
1.3 施工单位 7
1.4 设计单位 7
1.5 监理单位 7
1.6 施工范围 7
1.7 工期 7
1.8 质量目标 7
2建筑概况 8
3结构概况 8
3.1结构体系 8
3.2结构设计标准 8
3.3基础形式 8
3.4抗震设防烈度及设防等级 8
3.5框架等级 8
3.6混凝土强度等级 8
3.7钢筋 9
4施工条件 9
5施工总体进度计划及保证措施 9
5.1工期承诺及确保工期及施工进度网络图 9
5.2工程形象进度目标控制 9
5.3 施工进度计划管理措施 10
5.4工期目标 10
5.5工期保证措施 10
5.6工程进度的控制与管理措施 10
5.7进场材料的控制与管理措施 11
5.8过程控制与管理措施 11
5.9安全管理措施 11
5.10施工技术资料的指导、收集与管理措施 11
5.11主要工程材料投入计划 11
5.12 主要周转材料投入计划 12
5.13主要测量器具计划 12
5.14主要试验器具计划 12
5.15.主要检测器具计划 13
5.16 工期保证管理措施 13
5.16.1为确保总工程实现,采取以下保证措施 13
5.17劳动力保证措施 14
5.18 施工材料设备进场计划及其保证措施 14
6质量承诺及确保工程质量的保证措施 15
6.1流程图 16
6.1.1质量管理工作总流程见下图 16
6.1.2纠正和预防工作流程见下图 17 上海应复中心宿舍楼施工技术标:http://www.youerw.com/gongcheng/lunwen_16490.html