毕业论文

打赏
当前位置: 毕业论文 > 土木工程 >

污水处理厂环境影响评价(数学模型、类比调查)

时间:2016-12-01 22:13来源:毕业论文
为污水处理厂建设前的评价,主要包括以下几点:通过调查、监测等方法了解当地环境状况,进行工厂选址方案和污水处理工艺的比较;对当地的水、大气以及声环境质量做出评价;利

摘要:明珠湖旅游区目前还没有完整的污水收集系统,污水排放呈无序状态,雨污不分,其排放主要是依靠土壤的自然渗透,或明渠式自排的管道就近排入河道,环境污染状况较为严重,故需建立一座污水处理厂。而在此之前,需完成建设项目的环境影响评价。本课题为该污水处理厂建设前的评价,主要包括以下几点:通过调查、监测等方法了解当地环境状况,进行工厂选址方案和污水处理工艺的比较;对当地的水、大气以及声环境质量做出评价;利用数学模型、类比调查等方法对明珠湖污水处理厂施工期间造成的影响和它建成之后将对当地所产生的影响作出预测;列出公众参与的内容及意见;最后,提出结论与建议,包括建设项目拟采取的防治措施。

关键词: 明珠湖污水处理厂;环境影响评价;影响预测4102
The environmental impact assessment of Pearl Lake sewage treatment plant
Abstract: There is no complete sewerage system in Pearl Lake District,the discharge of wastewater is in disorder,rainwater and sewage are classified,their main emissions rely on the natural osmosis of soil,or open channel from the exhaust pipe into the nearby river,Environmental pollution is relatively serious, so we need to build a sewage treatment plant.Before this, we need to complete environmental impact assessment of the construction project.This issue is the evaluation before the construction of the sewage treatment plant,including the following points:we through investiging, monitoring and other methods to realize the condition of the local environment,and compare factory location scheme and sewage treatment process ;We evaluate quality of the water ,air and sound environment ;And we make a prediction about effects during the period of construction and the effect after it was built caused by the pearl lake sewage treatment plant through using mathematical model and investigation analogy;Listing the contents and opinions participated by the public and the results of the survey;Finally, we put forward the conclusion and the suggestion including prevented measures planned and taken by construction project.
Keywords: Pearl Lake sewage treatment plant;The environmental impact assessment;Impact prediction
 
目录
1.绪论    1
1.1 项目由来    1
1.2  编制依据    1
1.3  评价标准    2
1.3.1 环境质量标准    2
1.3.2 污染物排放标准    2
1.4 评价目的与原则    2
1.4.1 评价目的    2
1.4.2 评价原则    2
1.5 评价工作等级和范围    2
1.5.1 评价等级    2
1.5.2 评价范围    3
1.6 评价因子和环境保护目标    3
1.6.1 环境影响因素分析    3
1.6.2 主要评价因子    4
1.6.3 环境敏感保护目标    4
2.建设项目工程分析    5
2.1 项目概况    5
2.2 污水处理厂    5
2.2.1 厂区选址方案论证    5
2.2.2 污水量预测    5
2.2.3 污水处理工艺方案比较    6
2.2.4 厂区节能与消防    7
3. 建设项目周围环境简况    8
3.1 自然环境简况    8
3.1.1 地理位置    8
3.1.2 气候、气象    8
3.1.3 地势、地貌、地质    8
3.1.4 水文情况    8
3.2 社会环境简况    9
3.2.1 人口与经济水平    9
3.2.2 产业状况    9
4.水环境质量现状评价与预测分析    10 污水处理厂环境影响评价(数学模型、类比调查):http://www.youerw.com/gongcheng/lunwen_605.html
------分隔线----------------------------
推荐内容