FOREWORD The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD(AT&L) Memorandum dated 29 May 2002。 UFC will be used for all DoD projects and work for other customers where appropriate。  All construction outside of the United States is also governed by Status of forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA。) Therefore, the acquisition team must ensure compliance with the more stringent of the UFC, the SOFA, the HNFA, and the BIA, as applicable。76166

UFC are living documents and will be periodically reviewed, updated, and made available to users as part of the Services’ responsibility for providing technical criteria for military construction。 Headquarters, U。S。 Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Command (NAVFAC), and Air Force Civil Engineer Support Agency (AFCESA) are responsible for administration of the UFC system。 Defense agencies should contact the preparing service for document interpretation and improvements。 Technical content of UFC is the responsibility of the cognizant DoD working group。 Recommended changes with supporting rationale should be sent to the respective service proponent office by the following electronic form: Criteria Change Request (CCR)。 The form is also accessible from the Internet sites listed below。

UFC are effective upon issuance and are distributed only in electronic media from the following source:

Hard copies of UFC printed from electronic media should be checked against the current electronic version prior to use to ensure that they are current。

KATHLEEN I。 FERGUSON, P。E。The Deputy Civil Engineer DCS/Installations & Logistics Department of the Air Force

Dr。 GET W。 MOY, P。E。Director, Installations Requirements and ManagementOffice of the Deputy Under Secretary of Defense (Installations and Environment)

Contents

Page

CHAPTER 1 INTRODUCTION 

1-1 SCOPE 1-1

1-2 PURPOSE OF CRITERIA 1-1

1-3 SPECIFIC PROCESSES 1-1

CHAPTER 2 GENERAL REQUIREMENTS

2-1 GENERAL CRITERIA 2-1

2-2 COORDINATION 2-1

2-3 DESIGN PROCEDURE 2-1

2-3。1 Step 1 2-1

2-3。2 Step 2 2-2

2-3。3 Step 3 2-2

2-3。4 Step 4 2-2

2-3。5 Step 5 2-2

2-3。6 Step 6 2-2

2-3。7 Step 7 2-2

2-3。8 Step 8 2-2

2-4 DESIGN CRITERIA 2-2

2-4。1 Ductwork 2-2

2-4。2

上一篇:基于网络的注塑模具智能设计英文文献和中文翻译
下一篇:三维有限元分析英文文献和中文翻译

兰州某大酒店空调设计+CAD图纸

新能源空调系统设计英文文献和中文翻译

机械设计制造及其自动化英文文献和中文翻译

FPGA的全景拼接相机的优化...

海水淡化的优化设计英文文献和中文翻译

模拟退火技术来设计英文文献和中文翻译

超市空调系统英文文献和中文翻译

新課改下小學语文洧效阅...

互联网教育”变革路径研究进展【7972字】

老年2型糖尿病患者运动疗...

ASP.net+sqlserver企业设备管理系统设计与开发

麦秸秆还田和沼液灌溉对...

网络语言“XX体”研究

张洁小说《无字》中的女性意识

LiMn1-xFexPO4正极材料合成及充放电性能研究

安康汉江网讯

我国风险投资的发展现状问题及对策分析