2-4。3 Exhaust stacks 2-4
2-4。4 Air Pollution Control Equipment 2-4
2-4。5 Replacement Air 2-4
2-5 CONTROLS 2-7
2-5。1 Gauges and Sensors 2-7
2-5。2 Interlocks 2-8
2-5。3 Annunciator Panel 2-8
2-6 OPERATIONAL CONSIDERATIONS 2-9
2-6。1 Provision for System Testing 2-9
2-6。2 Energy Conservation 2-9
2-6。3 Recirculation 2-9
2-6。4 Maintenance 2-10
2-7 SAFETY AND HEALTH CONSIDERATIONS 2-10
2-7。1 Posting 2-10
2-7。2 Noise 2-10
2-7。3 Respiratory Protection 2-10
2-7。4 Emergency Showers and Eyewash Stations 2-11
2-7。5 Hygiene Facilities 2-11
2-8 COMMISSIONING 2-11
CHAPTER 3 ASBESTOS DELAGGING FACILITIES
i
3-1 FUNCTION 3-1
3-2 OPERATIONAL CONSIDERATIONS 3-1
3-2。1 Airborne Contamination 3-1
3-2。2 Heat Stress 3-1
3-2。3 Employee Workflow 3-1
3-3 TYPICAL FLOOR PLANS 3-1
3-4 DESIGN CRITERIA 3-2
3-5 EXHAUST AIR 3-2
3-5。1 Hood Design 3-2
3-5。3 Ductwork 3-3
3-5。4 Fans 3-4
3-5。5 Weather Stack Design and Location 3-4
3-5。6 Air Cleaning Devices 3-4
3-5。7 Industrial Vacuum System 3-5
3-5。8 Replacement Air 3-7
3-5。9 System Controls