菜单
  

    摘要通过认真学习工程量清单计价方式的计价流程以及计价规则,收集有关工程量清单计价的相关资料,了解当前招投标过程中的注意点。

    本工程采用万竹园18#四层结构,采用独立基础,框架结构。通过对图纸的研究,计算并编制工程量清单,工程量清单包括分部分项工程费,措施项目费,其他项目费,规费,税金。运用工程量清单计价方式计算工程量之后,计算投标费用其中主要的表格包括:分部分项工程量清单计价表、措施项目清单计价表、其他项目清单计价表和综合单价分析表等;此外完成了一篇关于工程量清单计价模式下工程造价的管理的论文,加强对工程造价的认识。51593

    通过本次毕业设计的学习工程,让我们更加深刻的认识和巩固了大学所学的知识,通过实践让我们能更加从容的面对即将到来的工作。也让我们更加清楚的认识到了工程量清单计价编制的过程。

    毕业论文关键词:工程量清单;清单编制;清单计价

    abstract Through careful study BOQ pricing pricing process and pricing rules, the Bill of Quantities collect relevant information about the current bidding process and pay attention.

    This project uses Wan Yuen 18 # four-layer structure, using an independent foundation, the frame structure. By drawing studies, use of the knowledge engineering fees calculated distribution analysis, measure project costs, other project costs, fees, taxes. The use of the Bill of Quantities calculated quantities, the cost of which the main computation of tender forms include: sub-part of the Bill of Quantities table, action items list pricing tables, tables and other items integrated unit inventory valuation analysis tables, etc.; addition completed one on the Bill of Quantities mode thesis project cost management to enhance awareness of the project cost.

    Through this study engineering graduate design, let us be more profound understanding and consolidate the university have learned, through practice so that we can be more calm in the face of the upcoming work. Also make us more clearly recognize the Bill of Quantities preparation process.

    Keywords:Bill of Quantities;Inventory preparation;Inventory valuation

    摘要在我国加入WTO之后,随着国际经济一体化发展,使我国更快更多地融入到世纪经济中。曾经招标工作中大都设有标底,但在当前的市场经济条件下这种工程造价管理的模式已经不再适应当前改革发展的需求,主要表现为不利于政府的职能转变,不利于企业之间相互的良性竞争。

    因此我们需要加快招投标模式中工程造价管理的改革,在招投标过程中实现量价分离,由招标人根据图纸计算工程量组成招标文件,让投标人逐项填写单价组成总价,以价低者得的原则最后签订合同。

    工程量清单计价是一种更符合国际计价规则的工程量计算方式,但是我国还需要很长一段时间才能与国际完全接轨,所以需要相关部门颁布更加先进的计算规则。

    毕业论文关键词:工程量清单;量价分离;清单计价

    abstract

    After China joins the WTO, along with the development of international economic integration, making faster and more integrated into our century economy.

    Most have a base price in the tender, but in the current market economy under the conditions of project cost management model that no longer meet the current needs of reform and development, mainly for not conducive to the transformation of government functions, is not conducive to mutual healthy competition.

    Therefore, we need to accelerate the bidding mode project cost management reforms in the bidding process to achieve separation of volume and price, calculated according to the drawings by the tenderer tender documents consisting of quantities, so fill out the bidder total price component, to the lowest bidder principle of contract finalization.

  1. 上一篇:多跨非对称预应力混凝土简支梁桥设计
  2. 下一篇:CFRP加固轴心受力钢结构构件的可靠性分析研究
  1. 钢筋混凝土现浇框架结构...

  2. 6层科大办公楼框架结构设计+CAD图纸

  3. 四层会议培训中心办公楼...

  4. BIM的综合楼工程商务标编制+CAD图纸

  5. 镇江市某住宅楼工程计价与BIM应用

  6. BIM综合楼工程技术标编制+CAD图纸

  7. 世伟商办楼工程量清单及招标控制价的编制

  8. 现代简约美式风格在室内家装中的运用

  9. 江苏省某高中学生体质现状的调查研究

  10. 中国传统元素在游戏角色...

  11. 浅析中国古代宗法制度

  12. NFC协议物理层的软件实现+文献综述

  13. 上市公司股权结构对经营绩效的影响研究

  14. 高警觉工作人群的元情绪...

  15. g-C3N4光催化剂的制备和光催化性能研究

  16. C++最短路径算法研究和程序设计

  17. 巴金《激流三部曲》高觉新的悲剧命运

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回