菜单
  

      RJX3 = 1.3434E+06(kN/m)  RJY3 = 1.2343E+06(kN/m)  RJZ3 = 0.0000E+00(kN/m)
     ---------------------------------------------------------------------------
      Floor No.   3     Tower No.   1
      Xstif=     8.0892(m)     Ystif=    21.5797(m)     Alf  =     0.0000(Degree)
      Xmass=     7.4245(m)     Ymass=    21.5594(m)     Gmass(活荷折减)=  1849.5836(  1711.5449)(t)
      Eex  =     0.0311        Eey  =     0.0011
      Ratx =     1.0000        Raty =     1.0000
      Ratx1=     1.1060        Raty1=     1.2827
      薄弱层地震剪力放大系数= 1.00
      RJX1 = 5.7200E+06(kN/m)  RJY1 = 5.7200E+06(kN/m)  RJZ1 = 0.0000E+00(kN/m)
      RJX3 = 1.3531E+06(kN/m)  RJY3 = 1.1956E+06(kN/m)  RJZ3 = 0.0000E+00(kN/m)
     ---------------------------------------------------------------------------
      Floor No.   4     Tower No.   1
      Xstif=     8.0892(m)     Ystif=    21.5797(m)     Alf  =     0.0000(Degree)
      Xmass=     8.1958(m)     Ymass=    21.7485(m)     Gmass(活荷折减)=  1915.4227(  1772.3293)(t)
      Eex  =     0.0050        Eey  =     0.0092
      Ratx =     1.0000        Raty =     1.0000
      Ratx1=     1.4848        Raty1=     1.5986
      薄弱层地震剪力放大系数= 1.00
      RJX1 = 5.7200E+06(kN/m)  RJY1 = 5.7200E+06(kN/m)  RJZ1 = 0.0000E+00(kN/m)
      RJX3 = 1.3467E+06(kN/m)  RJY3 = 1.1646E+06(kN/m)  RJZ3 = 0.0000E+00(kN/m)
     ---------------------------------------------------------------------------
      Floor No.   5     Tower No.   1
      Xstif=     8.0892(m)     Ystif=    21.5797(m)     Alf  =     0.0000(Degree)
      Xmass=     4.7549(m)     Ymass=    20.7626(m)     Gmass(活荷折减)=  1650.3804(  1557.6476)(t)
      Eex  =     0.1560        Eey  =     0.0446
      Ratx =     1.0000        Raty =     1.0000
      Ratx1=     0.9213        Raty1=     1.1524
      薄弱层地震剪力放大系数= 1.25
      RJX1 = 5.7200E+06(kN/m)  RJY1 = 5.7200E+06(kN/m)  RJZ1 = 0.0000E+00(kN/m)
      RJX3 = 1.2707E+06(kN/m)  RJY3 = 1.0407E+06(kN/m)  RJZ3 = 0.0000E+00(kN/m)
     ---------------------------------------------------------------------------
      Floor No.   6     Tower No.   1
      Xstif=    19.9634(m)     Ystif=    27.0797(m)     Alf  =     0.0000(Degree)
  1. 上一篇:洪洞汾河生态修复景观工程移民文化展示区规划设计
  2. 下一篇:建筑行业事故分析及风险管理研究
  1. 双星中学教学楼现浇钢筋...

  2. 五层恒顺宾馆框架结构设计+CAD图纸

  3. 五层青年旅社的框架建筑结构设计+图纸

  4. BIM五层锦江学院2号教学楼设计+图纸

  5. 综合医院的五层门诊大楼空调系统设计

  6. 南京市某大学音乐教学楼空调系统设计

  7. 宜兴市某小学新建教学楼...

  8. 中国传统元素在游戏角色...

  9. 巴金《激流三部曲》高觉新的悲剧命运

  10. 上市公司股权结构对经营绩效的影响研究

  11. NFC协议物理层的软件实现+文献综述

  12. 江苏省某高中学生体质现状的调查研究

  13. 浅析中国古代宗法制度

  14. 现代简约美式风格在室内家装中的运用

  15. C++最短路径算法研究和程序设计

  16. 高警觉工作人群的元情绪...

  17. g-C3N4光催化剂的制备和光催化性能研究

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回