摘要江苏射阳港位于江苏省盐城市境内,地处苏北沿海中部。本工程为:盐城港 射阳港区通用码头三期工程位于射阳河入海口左岸,码头前沿为射阳港出海航道, 东侧紧邻已建的通用码头一期工程。 78251
本次毕业设计是射阳港区。该码头为板梁式高桩码头,拟建一个 3000 吨级 散货码头。码头只设了一个泊位。本工程根据本地的地质水文资料来设计。本设 计主要进行了:码头的平面设置,码头的面板设计和配筋计算,纵横梁设计和配 筋计算,桩基计算,靠船构件的计算,施工组织设计。
毕业论文关键词:射阳港;散货码头;高桩码头;结构计算;结构设计;施工组织设计。
Abstract Sheyang port is located in Yancheng City, Jiangsu Province, Jiangsu Province, located in the central Jiangsu coastal areas。 Yancheng Sheyang port port universal dock, the third phase project is located in the Sheyang River into the sea on the left bank, dockside Sheyang port waterway to the sea, adjacent to the East has been built the universal dock a period project this project。
This graduation project is the Sheyang port area。 The terminal plate girder pile pler, plans to build a 3000 ton bulk cargo wharf。 The wharf has only one berth。 This project is designed according to the local geological and hydrological data。 This design is mainly carried out: the plane of the wharf, wharf panel design and reinforcement calculation, vertical and horizontal beam design and reinforcement calculation, the calculation of pile foundation, by the calculation of ship components, construction organization design。
Keywords:Sheyang port,ulk cargo wharf,girder pilepler, the calculation of ship components,construction design,construction organization design
目 录
第一章 绪论 1
1。1、工程概况 1
1。2 、施工自然条件及分析 3
1。2。1 、气温 3
1。2。2 、降水 3
1。2。3 、水文 4
1。2。4 、工程地质 4
1。2。5 地震 5
第二章 总平面布置 6
2。1 、布置原则 6
2。2 、设计依据 6
2。3 、设计船型 6
2。4 、码头年作业天数 6
2。5 、装卸工艺 7
2。5。1 装卸工艺设计原则 7
2。5。2 、装卸工艺选型及工艺流程 7
2。5。3 、主要装卸设备数量 7
2。6 、码头规模确定 8
2。6。1 、泊位通过能力计算 8
2。6。2 、泊位数计算 8
2。6。3 、泊位利用率 9
2。6。4 、仓库堆场尺度 9
2。7 、码头总平面布置 10
2。7。1 、码头前沿水深 10
2。7。2 、码头前沿高程 11
2。7。3 泊位长度和码头长度计算