在中国步入小康社会的道路上,工程造价创新是工程造价业所面临的必然问题。本文以工程算量的创新中的软件算量为中心,从广联达算量软件入手,结合八号办公楼工程来阐述软件算量在建筑工程算的运用方法。同时对于剪力墙中的地下室挡土墙为例将软件算量与手工算量进行对比分析,详细说明了软件算量与手工算量的各自特点及相互差异,最后本人对工程造价创新进行表达了自身的看法。79921
毕业论文关键词:工程造价创新、GCL建模、软件算量、手工算量、GBQ工程计价
Engineering Cost Skill and Innovation Analysis of No。 Eight Office Building
On the road of entering a well-off society in China,engineering cost innovation is an inevitable problem for the engineering cost industry。 Based on engineering calculation in the innovation of software calculation as the center,starting from the glodon count the amount of software,combined with the No。 eight office building project to elaborate software calculation method of construction engineering is in use。 At the same time for the shear wall in the basement retaining wall as the example of the software calculation and manual calculation were analyzed,a detailed description of the software calculation and the characteristics of manual calculation and mutual differences,finally I expressed their views on the engineering cost innovation。
Keywords: engineering cost innovation、GCL、Software calculation、manual calculation、GBQ
目 录
1 工程造价创新 1
1。1 工程造价创新的意义 1
1。2 工程造价创新的思考与方法 1
1。2。1.我国工程造价的现状 1
1。2。2 工程造价管理的思考 1
1。2。3 工程造价管理的方法 2
2 工程造价软件 2
2。1 软件的发展与现状 2
2。2 建筑工程造价软件简述 2
2。3 广联达算量软件的功能介绍 5
2。4 广联达算量软件的工作原理 5
3 八号办公楼工程概况 5
3。1 建筑设计概况 5
3。2 结构设计概况 8
4 软件算量 10
4。1 GCL工程算量软件的操作流程 10
4。1。1 建模步骤概述 10
4。1。2 新建项目,导入轴网 10
4。1。3 首层做法 11
4。1。4 其它层做法概述 11
4。1。5 套定额,输出工程量 12
4。2 GCL出现的问题及解决方法 13
4。3 GBQ计价软件 13
5 手工算量与软件算量的对比 15
5。1 墙面的软件算量 15
5。2 墙面的手工算量 16
5。2。1 识图 16
5。2。2 工程量计算规则 17
5。2。3 工程量计算式 18
5。2。4 混凝土墙计算举例