    摘要:建设施工的成本控制是建设施工的一个关键性目标。施工造价管理从工程投标报价开始,直至项目竣工结算完成为止,贯穿于项目实施的全过程。通过有效的全过程投资控制业主方能够对整个建设过程进行统一的控制,规避可能发生的投资风险。认为在市场竞争日益激烈的今天,有效的全过程投资控制是对建设施工成本控制的有力手段。本论文以施工总承包模式为例,在理论研究的基础上,还原施工总承包模式下的全过程投资控制的各个环节,并结合我国建筑市场全过程投资控制的实例,对国内现阶段全过程投资控制中存在的问题进行提出。并得出以下结论:(1)设计阶段,设计单位只进行初步设计概算和施工图预算的工作,不参与工程结算,导致造价控制的脱节(2)招标与施工阶段之间有很强的连带关系,招标方在招标阶段的任意压价,导致工程造价严重失真。这种情况使得个别施工单位通过低价中标,而在施工过程中施工方想方设法增加现场签证及技术变更,以获得额外收入,或者干脆偷工减料,在材料上以次充好来蒙混过关,留下质量隐患在施工阶段。本文将会根据各阶段的控制问题,提出各个阶段所存在问题的解决方法。10488
    关键词:施工总承包模式、全过程投资控制、工程造价管理、设计-招标-施工阶段
    Whole Investment Control during Construction Contract Mode
    Abstract: Cost control is the key of the construction project. Cost management of the construction should begin with the project bidding and end with the completion of the settlement, which happens throughout the whole project of construction. By effective investment control through the whole project, the owner can control the whole construction completely and avoid the investment risk. I think in today’s increasingly competitive market, the effective control of the whole process of investment is a powerful tool for the cost control of construction.
    This paper will take construction contract mode as an example. On the basis of theory study, every step of the whole investment control under this mode will be restored. Combined with real case of our country’s construction market, the questions, which have happened at the present stage, will be mentioned. And I get the conclusion as followed: (1) design period: designer only estimates preliminary design and budget of construction drawing, they does not participate in the project settlement, which lead to a mismatch between the investment control (2) There has a strong interlocking relationship between the bidding and construction period. When the bidder arbitrarily depresses the price, the building cost of project has to face the serious distortion. This situation results that some construction unit submit the bid by low price, and they may find any way to increase the on-site visa and technical changes during the project of construction to get more profit. In order to obtain greater benefit, they even choose to use inferior materials and turn out substandard goods and leave hidden trouble. The paper is based on every stage’s own problem to mention the solution.
    Key words: construction contract mode, whole investment control, cost control, design-bid-build period
     目录
    1  绪论    1
    1.1研究背景和意义    1
    1.1.1  研究背景    1
    1.1.2  研究意义    1
    1.2    国内外研究现状    3
    1.3    研究内容    4
    1.4 本章小结    5
    2    工程造价相关理论概述    6
    2.1    工程造价管理概述    6
    2.1.1  工程造价的概念    6
    2.1.2  工程造价的任务    6
  1. 上一篇:酒店空调工程设计+计算书
  2. 下一篇:小镇市民中心建筑设计毕业论文
  1. ANSYS大跨度预应力张弦梁结构施工过程模拟

  2. 钢筋混凝土现浇框架结构...

  3. EPC总承包项目的风险管理研究

  4. 高层建筑施工安全管理研究

  5. 商业办公中心消防设计

  6. 扬州港港区6万吨级件杂货...

  7. 某高层建筑消防设计

  8. g-C3N4光催化剂的制备和光催化性能研究

  9. 浅析中国古代宗法制度

  10. 中国传统元素在游戏角色...

  11. 现代简约美式风格在室内家装中的运用

  12. 巴金《激流三部曲》高觉新的悲剧命运

  13. 上市公司股权结构对经营绩效的影响研究

  14. NFC协议物理层的软件实现+文献综述

  15. 江苏省某高中学生体质现状的调查研究

  16. 高警觉工作人群的元情绪...

  17. C++最短路径算法研究和程序设计

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回