摘要连云港港位于陇海铁路的东部起点,地处江苏省北部沿海,为我国沿海主要港口之一,同时也是我国沿海中部外贸运输以及能源外运的重要口岸。港口所依托的连云港市为我国水运、陆运的重要枢纽,承担着水陆联运和洲际海运的重任,港口区位优势十分明显。80365
随着经济的高速发展,国内市场对矿石的需求越来越大,连云港区现有的吞吐能力满足不了散货吞吐量的发展,目前,散货泊位处于超负荷的运营状态。拟建的徐圩港区十万吨级散货码头将缓解连云港港码头能力不足的需要。
本设计内容而下:收集连云港港徐圩港区码头水文、地质资料,了解港区货运需求分析和泊位运营状况。对资料分析整理确定了本工程设计的结构形式为高桩码头,设计年吞吐量为1000万吨。紧接着进行码头总平面布置和结构尺寸的拟定,进行码头荷载计算、面板设计、纵梁及轨道梁设计、横向排架设计和桩基计算以及靠船构件的内力计算,最后简要阐述了施工组织设计。在内力计算中,部分内力计算借助软件进行运算。
毕业论文关键词:连云港港;徐徐圩港区;散货码头;高桩码头
AbstractLianyungang port is located in the eastern starting point of the Longhai Railway,the east of the northern jiangsu coastal, is one of the major ports along the coast of China, is also the central coastal foreign foreign trade port transport and energy Sinotrans in China。
By relying on the port of Lianyungang City is the important hub of watertransport and land transport in China,and assume the task of intercontinental shipping,location advantages obviously。
With the rapid economic development, the domestic market demand for ore is growing, capacity Lianyungang area has been far from satisfying the needs of the development of cargo throughput, bulk cargo berth is currently operating in overload status。 Xu Wei proposed harbor one hundred thousand tons of bulk terminal will ease the need of lianyungang port capacity。
This graduation project design mainly for the following work: first, collect Xu Wei lianyungang port wharf hydrological and geological information, find out the status of the port cargo demand analysis and berthing operation。 Then the analysis of data to determine the wharf structure of the engineering design for piled wharf,design annual throughput of 10 million tons。 Then proposed terminal general layout and the structure of the proposed size, terminal load calculation, panel design, stringers and track beam design, and design of transverse bent and piles and Calculation of Internal Forces member by boat, and finally briefly describes the construction organization design。 In internal force calculation, a part of the internal force calculation by means of software arithmetic。
Keywords: Lianyungang port;Xuwei port;ore terminal;piled wharf
目 录
第一章 绪论 1
1。1连云港港概述 1
1。2徐圩港区货运需求分析 1
1。3连云港区泊位营运现状 4
1。4港口现状分析 4
1。5建设的必要性 5
1。6本工程吞吐量安排及集疏运量安排 6
第二章 设计资料 7
2。1地理位置 7
2。2设计水位 7
2。3气象资料 7
2。4水文资料 8
2。5地质 连云港港徐圩港区高桩码头工程设计+图纸:http://www.youerw.com/gongcheng/lunwen_93319.html