三、承台自重和承台上土自重标准值 Gk:
a = 2 * Sc + Sa = 2*500+1500 = 2500mm
b = 2 * Sc + Sb = 2*500+1500 = 2500mm
承台底部面积 Ab = a * b = 2.500*2.500 = 6.25m
承台体积 Vct = Ab * H1 = 6.25*0.900 = 5.625m
承台自重标准值 Gk'' = γc * Vct = 25.00*5.625 = 140.6kN
承台上土自重标准值 Gk' = γs * (Ab - bc * hc) * ds
= 20.00*(6.25-0.700*0.700)*1.100 = 126.7kN
承台自重和承台上土自重标准值 Gk = Gk'' + Gk' = 140.6+126.7 = 267.3kN
四、承台验算:
圆桩换算桩截面边宽 bp = 0.866 * d = 0.866*500 = 433mm
1、承台受弯计算:
(1)、单桩桩顶竖向力计算:
在轴心竖向力作用下
Qk = (Fk + Gk) / n (基础规范 8.5.3-1)
Qk = (4336.4+267.3)/4 = 1150.9kN ≤ Ra = 1500.0kN
每根单桩所分配的承台自重和承台上土自重标准值 Qgk:
Qgk = Gk / n = 267.3/4 = 66.8kN
扣除承台和其上填土自重后的各桩桩顶相应于荷载效应基本组合时的竖向力设计值:
Ni = γz * (Qik - Qgk)
N = 1.35*(1150.9-66.8) = 1463.5kN
(2)、X 轴方向柱边的弯矩设计值:(绕 X 轴)
Mxct = 2 * N * (Sb - bc) / 2 = 2*1463.5*(1.500-0.700)/2 = 1170.8kN•m
②号筋 Asy = 4347mm ζ = 0.057 ρ = 0.23%
2216@110 (As = 4423)
(3)、Y 轴方向柱边的弯矩设计值:(绕 Y 轴)
Myct = 2 * N * (Sa - hc) / 2 = 2*1463.5*(1.500-0.700)/2 = 1170.8kN•m
①号筋 Asx = 4231mm ζ = 0.054 ρ = 0.21%
2216@110 (As = 4423)
2、承台受冲切承载力验算:
(1)、柱对承台的冲切验算:
扣除承台及其上填土自重,作用在冲切破坏锥体上的冲切力设计值:
Fl = 5854140N
柱对承台的冲切,可按下列公式计算:
Fl ≤ 2 * [βox * (bc + aoy) + βoy * (hc + aox)] * βhp * ft * ho
(基础规范 8.5.17-1)
X 方向上自柱边到最近桩边的水平距离:
aox = 750 - hc / 2 - bp / 2 = 750-700/2-433/2 = 183mm
λox = aox / ho = 183/(900-110) = 0.232
X 方向上冲切系数 βox = 0.84 / (λox + 0.2) (基础规范 8.5.17-3)
- 上一篇:建设工程项目施工进度管理研究
- 下一篇:上海综合大楼的空调设计说明书+CAD图纸
-
-
-
-
-
-
-
上市公司股权结构对经营绩效的影响研究
C++最短路径算法研究和程序设计
巴金《激流三部曲》高觉新的悲剧命运
高警觉工作人群的元情绪...
现代简约美式风格在室内家装中的运用
NFC协议物理层的软件实现+文献综述
浅析中国古代宗法制度
江苏省某高中学生体质现状的调查研究
中国传统元素在游戏角色...
g-C3N4光催化剂的制备和光催化性能研究