菜单
  

      Ratx1=     1.3650        Raty1=     1.3481
      Ratx2=     1.1486        Raty2=     1.1411
      薄弱层地震剪力放大系数= 1.00
      RJX1 = 2.7248E+07(kN/m)  RJY1 = 4.1586E+07(kN/m)  RJZ1 = 0.0000E+00(kN/m)
      RJX3 = 6.2716E+05(kN/m)  RJY3 = 6.6828E+05(kN/m)  RJZ3 = 0.0000E+00(kN/m)
      RJX3/H = 2.1626E+05(kN/m)  RJY3/H = 2.3044E+05(kN/m)  RJZ3/H = 0.0000E+00(kN/m)
     ---------------------------------------------------------------------------
      Floor No.  14     Tower No.   1
      Xstif=    10.6782(m)     Ystif=    17.3328(m)     Alf  =     0.0000(Degree)
      Xmass=    11.2224(m)     Ymass=    16.0775(m)     Gmass(活荷折减)=   585.0012(   542.5070)(t)
      Eex  =     0.0403        Eey  =     0.1125
      Ratx =     1.0000        Raty =     1.0000
      Ratx1=     1.4388        Raty1=     1.4216
      Ratx2=     1.1645        Raty2=     1.1561
      薄弱层地震剪力放大系数= 1.00
      RJX1 = 2.7248E+07(kN/m)  RJY1 = 4.1586E+07(kN/m)  RJZ1 = 0.0000E+00(kN/m)
      RJX3 = 6.0670E+05(kN/m)  RJY3 = 6.5071E+05(kN/m)  RJZ3 = 0.0000E+00(kN/m)
      RJX3/H = 2.0921E+05(kN/m)  RJY3/H = 2.2438E+05(kN/m)  RJZ3/H = 0.0000E+00(kN/m)
     ---------------------------------------------------------------------------
      Floor No.  15     Tower No.   1
      Xstif=    10.6782(m)     Ystif=    17.3328(m)     Alf  =     0.0000(Degree)
      Xmass=    11.2224(m)     Ymass=    16.0775(m)     Gmass(活荷折减)=   585.0009(   542.5068)(t)
      Eex  =     0.0403        Eey  =     0.1125
      Ratx =     1.0000        Raty =     1.0000
      Ratx1=     1.5388        Raty1=     1.5327
      Ratx2=     1.1968        Raty2=     1.1921
      薄弱层地震剪力放大系数= 1.00
      RJX1 = 2.7248E+07(kN/m)  RJY1 = 4.1586E+07(kN/m)  RJZ1 = 0.0000E+00(kN/m)
      RJX3 = 5.7889E+05(kN/m)  RJY3 = 6.2538E+05(kN/m)  RJZ3 = 0.0000E+00(kN/m)
      RJX3/H = 1.9962E+05(kN/m)  RJY3/H = 2.1565E+05(kN/m)  RJZ3/H = 0.0000E+00(kN/m)
     ---------------------------------------------------------------------------
      Floor No.  16     Tower No.   1
      Xstif=    10.6954(m)     Ystif=    17.2747(m)     Alf  =     0.0000(Degree)
      Xmass=    11.2224(m)     Ymass=    16.0775(m)     Gmass(活荷折减)=   585.0012(   542.5070)(t)
      Eex  =     0.0403        Eey  =     0.1077
  1. 上一篇:五层钢筋混凝土现浇框架结构设计+CAD图纸
  2. 下一篇:省道公路设计计算书+CAD图纸
  1. 高层商务综合楼的建筑设计

  2. 某会议培训中心建筑四层框架结构设计+图纸

  3. 四层会议培训中心办公楼...

  4. 五层青年旅社的框架建筑结构设计+图纸

  5. 镇江市某住宅楼工程计价与BIM应用

  6. 建筑垃圾资源化的问题与对策研究

  7. 南京某建筑地源热泵系统设计+CAD图纸

  8. 高警觉工作人群的元情绪...

  9. 中国传统元素在游戏角色...

  10. 巴金《激流三部曲》高觉新的悲剧命运

  11. 浅析中国古代宗法制度

  12. g-C3N4光催化剂的制备和光催化性能研究

  13. 现代简约美式风格在室内家装中的运用

  14. 江苏省某高中学生体质现状的调查研究

  15. 上市公司股权结构对经营绩效的影响研究

  16. C++最短路径算法研究和程序设计

  17. NFC协议物理层的软件实现+文献综述

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回