    2. The sludge sedimentation performances pretty good; its excess sludge quantity much less than the traditional activated sludge process.
    3. Its power of resistance against the quality and quantity of water change’s impact is strong, it is flexible to operate; When water fluctuation is larger it is had better consider to set up regulation pool.
    4. It is not easy to happen the sludge expansion and the facilities that sewage treatment plant equipped are comparative less on the type and quantity. Also the control system is simple, safe and reliable of operation.
    5. Getting higher volume utilization; the whole system runs in a pushing streaming way, while the reaction zones are in the form of completely mixed operation, in order to realize the synchronization of carbide and nitrification - denitrification function to improve the ability of removing organic matter.
    6. CASS is continuous with inflow water, the inlet pipe road needs without control components such as solenoid valve, its single pool can run independently; the technological process is simple, the layout is compact, the investment is low and the automation in a high degree.
    7. In the pool aeration is cyclical, also there exists changes in the concentration of dissolved oxygen, and the oxygen concentration gradient is so large which can lead to high transmission rate that energy saving effect is remarkable [2].
    After determining the main body structure, then according to the original data and conditions as follows:
    item    Chemical
    Oxygen Demand    Biochemical Oxygen Demand    Suspended solid
    Inflow
    water quality
    ( )
    1200    700    500
    Effluent water quality( )
    ≤100    ≤30    ≤100
    (The COD, BOD values in inflow water are relatively high, so the urban sewage ought to be mixed with certain volume industrial waste water)
    On the basis of getting know with textbook again and check data seriously, and combining with the specific design requirements, in succession to determine the grille that used to remove large volume of waste, settling equipment, the second sedimentation pond to get rid of the water suspended solids and deactivation activated sludge produced after the process of biochemical treatment. In order to guarantee the final sludge got treated completely on a largest extent, setting up a belt type filter press. The recycling water up to standard can be directly get an available used in the corresponding place in factory results in achieving the best combination of decontamination, environmental protection and economy.
    There is putting forward a variety of solutions to this treatment process design .under the repeated comparison, finally determine an optimal solution.
    Grille - pumps - fine grille - regulating reservoir - flat flow grit chamber-Cyclic Activated Sludge System pool - the second sedimentation pond - concentrated tank - clear water reservoirs [3] (Note: SBR process characteristics show that it can set without the  primary settling tank and the second sedimentation pond, but there is no one processing structure to remove in water with a great quantities. So considering set a to remove Suspended Solid and deactivated sludge produced through biochemical pool effectively. In addition the sludge from second sedimentation pondcan back into the biochemical pool, raising its sludge load, which achieve a virtuous circle.
    The design’s whole budget including fixed assets (land charges+ structure engineering cost, construction fee + the cost of equipment)plus operating cost (salary and welfare +expenditure on power wage+ production water cost + transportation cost + maintenance charges), the total investment cost is RMB 63.079 million. Among them tooling plant takes up more, the operation cost is RMB 2.406 million.
    Keywords:  Urban wastewater;High biological availability;Sequencing Batch Reactor;Intermittent operation;Economy;Cyclic Activated Sludge System
  1. 上一篇:高浓度制药废水氧化降解处理工艺的研究+答辩PPT
  2. 下一篇:城镇生活污水处理厂工艺设计+CAD图纸+高程图
  1. 日处理10万立米城市污水深度处理工艺设计

  2. UASB+SBR某中药厂污水处理工程设计+CAD图纸

  3. 《分析化学》教学中培养...

  4. SBR镇江市某中医院污水处理工程设计

  5. 日处理2万立米城市污水厂...

  6. 初中学生化学学科核心素...

  7. 日处理6万吨城市污水的工艺设计+CAD图纸

  8. 高警觉工作人群的元情绪...

  9. 中国传统元素在游戏角色...

  10. 巴金《激流三部曲》高觉新的悲剧命运

  11. 现代简约美式风格在室内家装中的运用

  12. C++最短路径算法研究和程序设计

  13. 上市公司股权结构对经营绩效的影响研究

  14. g-C3N4光催化剂的制备和光催化性能研究

  15. 江苏省某高中学生体质现状的调查研究

  16. 浅析中国古代宗法制度

  17. NFC协议物理层的软件实现+文献综述

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回