This design is an annual output of 100 thousand tons of beer waste water treatment process。 According to the processing scale and quality, through the analysis of selection of comparison and selection of appropriate treatment。 According to the organic content of beer waste water can be pided into 3 categories: clean waste water such as cooling water chiller, cooling wort water。 This kind of waste water not contaminated。 The cleaning waste water such as rinsing yeast water, washing water, washing water production device, this kind of waste water polluted。 The slag containing liquid waste such as wheat bad, hot and cold coagulation。 The remaining yeast, such a large number of organic waste water containing suspended solids。 The brewery waste water produced working together to discharge。 By analyzing the processing quality of knowledge of organic pollutants is higher, but the good biodegradability, it was decided to adopt the biological treatment can reach the effluent standard。 The pre-treatment section mainly uses the physical method, used to remove suspended substances in water and particulate organic matter。 Two level processing mainly by biological method, including UASB+SBR, can be effective removal of BOD, COD and so on。 The design process is determined by: beer production waste water, grille set wells and the sewage pumping station to adjust the sedimentation tank effluent of UASB reactor, SBR, ponds, sludge treatment。 Section into gravity thickener Concentrated and sent to the filter press for watering treatment。

The whole design process selection technology is mature, the effect is remarkable, reliable operation, simple management process, to ensure the effect of sewage treatment。

Keywords:  Beer Waste water;UASB;SBR

目   录

1 绪论 1

  1。1 设计背景 1

  1。2 课题任务说明 1

  1。3 设计依据 1

  1。4 设计原则 1

2 工艺论证 3

  2。1 设计水量 3

  2。2 设计进水水质 3

  2。3 设计出水水质 3

  2。4 工艺流程 4

    2。4。1 工艺比选 4

    2。4。2 工艺确定 6

    2。4。3 工艺流程框图 6

3 废水工艺设计说明及计算 7

  3。1 格栅集水井 7

    3。1。1 主要参数 8

    3。1。2 设计计算 9

  3。2 调节沉淀池 10

    3。2。1 主要参数 10

    3。2。2 设计计算 10

  3。3 UASB反应器 11

    3。3。1 主要参数 11

    3。3。2 设计计算 11

  3。4 中间沉淀池 17

    3。4。1 主要参数 17

    3。4。2 设计计算 17

  3。5 SBR 20

    3。5。1 主要参数

上一篇:日处理80000立方米城镇污水处理厂的工艺设计+CAD图纸
下一篇:GC/MS气质联用法分析轮胎橡胶气味

年产30万吨环氧丙烷项目设计

年产50万吨的合金棒材生产车间设计

年产10万吨锌精矿的沸腾焙烧车间设计+CAD图纸

CASS日处理4万吨污水处理厂...

年产20万吨乙二醇中浮阀精馏塔的设计

年产20万吨乙二醇换热器设计

年产20万吨乙二醇工艺设计

新課改下小學语文洧效阅...

互联网教育”变革路径研究进展【7972字】

我国风险投资的发展现状问题及对策分析

老年2型糖尿病患者运动疗...

网络语言“XX体”研究

麦秸秆还田和沼液灌溉对...

ASP.net+sqlserver企业设备管理系统设计与开发

LiMn1-xFexPO4正极材料合成及充放电性能研究

张洁小说《无字》中的女性意识

安康汉江网讯